INSP-Final Inspection | 1/17/2002 | 1/18/2002 | 1/18/2002 | A | PASS |
Troy Cobbley
|
|
|
Underground sprinkler line finaled 1/17/2002 2:00:48 PM
|
DOC - Permit Finaled | 1/17/2002 | 1/17/2002 | 1/17/2002 | P | PASS |
Troy Cobbley
|
|
|
Finaled by inspector at 1/17/2002 2:02:35 PM
|
INSP-Sprinkler Rough-in/Hydro | 12/18/2001 | 12/20/2001 | 12/20/2001 | A | PASS |
Troy Cobbley
|
|
|
above ground, underground and FDC hydro tests OK 12/20/2001 4:00:42 PM
|
INSP-Supply line flush | 12/18/2001 | 12/19/2001 | 12/19/2001 | A | PASS |
Troy Cobbley
|
|
|
Supply line flush OK 12/19/2001 11:15:34 AM
|
INSP-Sprinkler Rough-in/Hydro | 8/8/2001 | 8/9/2001 | 8/9/2001 | A | FAIL |
Joe Tawney
|
|
|
FDC piping to vlv box, Thrust plates on wrong side of wall 8/9/2001 11:15:12 AM
|
INSP-Sprinkler Rough-in/Hydro | 8/7/2001 | 8/7/2001 | 8/7/2001 | P | PART |
Joe Tawney
|
|
|
OK to cover supply line FDC piping yet to be completed 8/7/2001 3:52:27 PM
|
INSP-Sprinkler Rough-in | 8/6/2001 | 8/6/2001 | 8/6/2001 | P | FAIL |
Joe Tawney
|
|
|
Fail Do not cover Did not have access to permit 8/6/2001 3:31:54 PM
|
Issue and Print Permit | | | 8/1/2001 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 7/31/2001 | | 7/31/2001 | | DONE |
|
|
|
|
Telephone call | | | 7/31/2001 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 7/27/2001 | | 7/30/2001 | | DONE |
|
|
|
7/30/2001 14:10:14 JWA - activity updated through activity FIRA22 from case FIR01-00418.
|
Sprinkler Plan Check | 7/30/2001 | | 7/30/2001 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/30/2001 | | DONE |
Bill Alexander
|
|
|
|
Application received | | | 7/27/2001 | | PASS |
Bill Alexander
|
|
|
|
Case Summary | | | | | DONE |
|
|
|
|