Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberFIR01-00436
StatusFinaled
Name SIMPLEX/GRINNELL
Site Address 746 W MAIN ST
Project NameALM-CAPITAL TERRACE
Customer Number 
ePlanReview 
Description
SCOPE: To upgrade the existing Capital Terrace building alarm system in accordance with a letter by Larry Hansen dated 1/24/2002 and the terms as noted in the approval dated 2/11/02 by the Boise City Fire Department, and in an e-mail memo by Larry Hansen dated 2/4/2002 and the terms as noted in the approval dated 2/11/02 by Sam Rogers. This is Phase 1 of the approved upgrade agreement. Per the agreement, additional manual pull stations (to provide pulls at all exits) and upgrading a/v alarm devices to meet UFC 1007.3.3.3 and NFPA 72, will not be required under this Phase 1 permit.


The associated building permit (BLD 00-02971, PITA PIT) is to remodel for a new 1,011 sq.ft. tenant (784 sq.ft. main floor, 227 sq. ft. mechanical mezzanine) in existing building, changing occupancy from an (A 3) restaurant to a (B) occupancy restaurant per approved plans on file. The former restaurant space is being split up into two tenant spaces. Adjacent portion is "McDonalds" done under BLD00 01146. Work to include miscellaneous demolition, upgrading a restroom to meet current accessibility standards, one hour rated CMU wall infill in existing one hour rated occupancy separation wall, interior finish, new walk in cooler, fire sprinkler adjustments, mechanical equipment including a new Ventless Hood installation over electric griddle, mechanical work, plumbing work, and electrical work.

2/26/2004 - ADDITIONAL SCOPE: The architectural backgrounds do not reflect the field conditions of current tenants. (i.e. Scandiadown, AMG Fine Housewares, Clark Photography, Boise Floral Company and Purple Sage are no longer there). Napoleon's for Men, 110 N. 8th, BLD03-01106 is a TI that has occurred since 1/1/2003. Per the agreement, effective 1/1/2003, any TI will trigger the upgrade of the existing manual fire alarm system and existing audio/visual (speaker/strobes) throughout the building. A new Fire Alarm Permit will be required for the completion of the upgrade agreement dated 2/4/2002.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection2/23/20052/24/20052/24/2005APASS
DetailsTroy Cobbley
Fire alarm finaled 2/24/2005 9:29:08 AM
DOC - Permit Finaled2/24/20052/24/20052/24/2005APASS
DetailsTroy Cobbley
Finaled by inspector at 2/24/2005 9:29:13 AM
CHANGE STATUS TO (ISS)  9/22/2004 DONE
Re-issued
(F) Reprint permit  9/22/2004 DONE
Alarm Plan Check  9/20/2004 PASS
Plan Modification (As-builts) of entire fire alarm system to this date. Resubmittal was required as part of the finalization of this FIR. See entry dated 9/15/2004 per Rick Jackson's requirements.
PLANS/APPL TAKEN TO FRONT DESK  9/20/2004 DONE
Permit Ready to Issue  9/20/2004 DONE
Inspection Record Card- Fire9/20/2004 9/20/2004 DONE
Telephone call  9/20/2004 DONE
Spoke with Chris and told him that permit is ready & fees///9/20/04 2:35pm BAS
Plan resubmittals received  9/17/2004  
INSP-Final Inspection9/14/20049/15/20049/15/2004AFAIL
DetailsRick Jackson
bryan; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Need updated, rated door on shaft and resubmittals 9/15/2004 10:08:10 AM
INSP-Final Inspection8/20/20048/23/20048/23/2004PFAIL
DetailsRick Jackson
brian; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Need plan modifications due to deletions/additions; need rated doors at access holes in top of shaft to maintain 2 hr shaft; need mechanical engineering analysis for Gino's TI and plans to match changes 8/23/2004 4:21:32 PM
INSP-Final Inspection8/18/20048/19/20048/19/2004PPART
DetailsTroy Cobbley
BRAIN; Phone #: ###-#### Internet Inspection Request from: Annette Moore

Completed elevator testing on North and South elevators; acceptable per the drawings.

Completed sprinkler testing on fire pump, Dry System A and Dry System B; acceptable per the drawings.

Left to test:

All existing kitchen hoods (less Gino's Pizzeria and Creapery).
Center elevator, controls being installed on Friday 8/20/2004.
HVAC shutdown system for Gino's Pizzeria.
INSP-Final Inspection8/10/20048/13/20048/13/2004PFAIL
DetailsRick Jackson
BRIAN; Phone #: ###-#### Internet Inspection Request from: Annette Moore See notes from Mary F. 8/13/2004 4:37:42 PM
Miscellaneous action  8/13/2004 DONE
Field tested the following (acceptable):

2 - antifreeze valve tampers
2 - dry system valve tampers (A&B)
6 - fire pump valve tampers
1 - fire pump run

Need to retest the following:

1 - fire pump flow switch
2 - dry system HI/LO pressure (A&B)
2 - dry system flows (A&B)

Items not tested:

Cooking hood monitoring points for Gino's (existing), Shige, Piper Pub, Crapery and Pita Pit.

Failure on the field test:

Elevators: plans show primary and alternate recall, there was nothing connected to the elevator controls for any recall, Romar trying to get the elevator company out on Monday.

Gino's: Duct detector installed in the supply side of the MAU, return air plenum above ceiling with 3 heat pumps, supply air mixing in plenum, needs to be reviewed by the designer.

Gino's cooking hood (existing): Stopped the inspection at this point, the hood appeared exceptionally greasy and I could not find any cleaning or inspection stickers.
INSP-Conference7/13/20047/13/20047/13/2004PPART
DetailsRick Jackson
brian - note:capital terrace parking garage; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Met with Brian and smoke detectors are required at top of the shaft in each beam pocket 7/13/2004 4:04:27 PM
INSP-Conference4/5/20044/6/20044/6/2004APART
DetailsRick Jackson
robert; Phone #: ###-#### Internet Inspection Request from: Darla Downs Met with Robert about the scope of this permit; Larry H. has approved the addition of the hood systems to the alarm panel and the connection of the alarm panels but has not approved any other work; I need a conference with Sam and Mary about the scope of work of this permit 4/6/2004 11:21:39 AM
Plan assigned to (SAM)8/7/2001 2/27/2004 DONE
Alarm Plan Check  2/27/2004 PASS
Approved pending field inspection of fire alarm permit comments.
PLANS/APPL TAKEN TO FRONT DESK  2/27/2004 DONE
Inspection Record Card- Fire2/27/2004 2/27/2004 DONE
Permit Ready to Issue  2/27/2004 DONE
Telephone call  2/27/2004 DONE
called chris permit ready & fee given 2-27-04 2:24 ///dld
Issue and Print Permit  2/27/2004 DONE
Plan resubmittals received  2/19/2004 DONE
Alarm Plan Check5/9/2002 5/16/2002 FAIL
Plans do not address all items speicified in previous review and some proposed plan modifications do not meet Code requirements. Revised review comments faxed to Simplex and discussed by phone with Stephanie, Peter and Chris. Also discussed with Larry Hansen.
Alarm Plan Check  3/4/2002 FAIL
CONDITIONAL APPROVAL TO BEGIN FIELD INSTALLATION granted prior to receiving REQUIRED resubmittal.
Alarm Plan Check2/15/2002 3/1/2002 PEND
Plan review of resubmittal not completed due to need for additional information. Per telcon with Stephanie Cribbs, Simplex, information will be provided on Monday.
Alarm Plan Check  9/6/2001 PEND
Plans are not comlete and do not include interconnection requirements to the high rise portion. Discussed plan modifications required by phone with Peter Petronich and Teroy Cobbley 9/6, they will resubmit revised plans. This will not be considered a "review" as we are just establishing requirements at this point.
Application received  8/7/2001