Case Summary | | | 7/21/2004 | | DONE |
|
|
|
|
Plan resubmittals received | | | 9/2/2003 | | DONE |
|
|
|
|
Miscellaneous action | | | 9/12/2002 | | DONE |
|
|
|
another reinspection fee per Rick
|
(F) Reprint permit | | | 9/12/2002 | | DONE |
|
|
|
|
INSP-Final Inspection | 9/10/2002 | 9/11/2002 | 9/11/2002 | P | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 09/10/2002 at 18:12:40. Contact: ###-####. 4 horn circuits shown on plans - 3 installed need to verify voltage drops and locations of EOL's; need supervised ball valve switch for dry system alarm switch; labels not fixed for tampers 9/11/2002 2:40:10 PM
|
INSP-Final Inspection | 7/9/2002 | 7/9/2002 | 7/9/2002 | P | FAIL |
Rick Jackson
|
|
|
MARK ###-#### reinspection fee added via e-mail to Linda; need updated plans; sprinkler flow switch sticks; outside bell doesn't work; need tamper for alarm pressure switch; wiring for tamper and in attic area has repeat open splices; strobes not sync'd per plans 7/9/2002 4:36:25 PM
|
INSP-Alarm Testing | 12/19/2001 | 12/27/2001 | 12/27/2001 | P | FAIL |
Rick Jackson
|
|
|
###-#### c/n issued; list too long for here 12/27/2001 4:47:33 PM
|
Inspection Record Card- Fire | 11/5/2001 | | 11/5/2001 | | DONE |
|
|
|
|
Telephone call | | | 11/5/2001 | | DONE |
|
|
|
Talked to Marlene permit ready
|
Issue permit | | | 11/5/2001 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/2/2001 | | PASS |
|
|
|
|
Alarm Plan Check | | | 11/2/2001 | | PASS |
|
|
|
Resubmittal of Oct 17 approved upon receipt of elevator upgrade agreement received and approved by the FD on Nov 1.
|
Plan assigned to (SAM) | 8/8/2001 | | 11/2/2001 | | DONE |
|
|
|
11/2/2001 13:48:30 SLR - activity updated through activity FIRA22 from case FIR01-00437.
|
Alarm Plan Check | 10/17/2001 | | 10/29/2001 | | PEND |
|
|
|
Hold for receipt of FD approval of a delayed Elevator Upgrade agreement.
|
Telephone call | | | 10/29/2001 | | PEND |
|
|
|
called Rick Berg, Alterra to follow-up on his call of 10/15 indicating he would send in a request for a delayed elevator upgrade plan; not received yet.
|
Alarm Plan Check | | | 8/28/2001 | | FAIL |
|
|
|
Review comments faxed to Simplex.
|
Application received | | | 8/8/2001 | | |
|
|
|
|
Permit VOIDED | 9/17/2003 | 9/17/2003 | | | |
|
|
|
per Sam rogers
|