Permit Information
Permit NumberFIR01-00444
StatusFinaled
Name TREASURE VALLEY FIRE
Site Address 11311 W CHINDEN BLVD
Project NameSPR H-P (CHEMICAL SERVICE)
Customer Number 
ePlanReview 
Description
(H-P CHEMICAL SERVICE BUILDING, PART OF HEWLETT-PACKARD BUILDING 6-WEST) To remodel, upgrade, modify the fire sprinkler system protection within an 9,072 ft/2, portion of the existing 45,913 ft/2, 1st & 2nd stories (41,718 main / 4195 2nd levels, 9600 ft/2 basement, of building #6-West. This project involves creating rooms & areas for use as storage and distribution of hazardous materials to serve the "H-6" occupancy, fabrication area located in H.P. #6-East. Includes the upgrade of existing firewalls between "H" to "H" occupancies and "H" to "B/S1" occupancies". The fire suppression sprinkler system and related alarm notification systems shall conform with current adopted City of Boise codes and ordinances, UFC 1997, NFPA 13-1999, approved plans, notes and attached plan review conditions as regulated by the Fire Department. NOTE: The entire HP Building #6 (East - West 1st & 2nd floors & basement) is listed as currently sprinklered. Hazardous Materials Inventory Statement provided by Winslow Partnership is used to establish UBC & UFC requirements. A"Certificate of Occupancy" for the entire HP#6- E/W Occupancy is required at the final approval of the Chem Storage & Nickel Plating / Fabrication expansion project. This fire permit is attached to BLD01-01169.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled12/6/200112/6/200112/6/2001PPASS
DetailsTroy Cobbley
Added by Inspector: 430 On 12/6/2001 5:03:58 PM Fire sprinkler system finaled
INSP-Final Inspection11/30/200111/30/200111/30/2001PPASS
DetailsTroy Cobbley
Fire sprinkler system finaled. OK for perm occ 11/30/2001 10:32:00 AM
INSP-Final Inspection11/7/200111/8/200111/8/2001AFAIL
DetailsTroy Cobbley
Change rack heads to QR, install drum drip sign, valve on in rack system to be monitored. Trip test of dry valve OK. Hydro test OK 11/8/2001 11:47:23 AM
Issue permit  10/15/2001 DONE
Inspection Record Card- Fire10/12/2001 10/12/2001 DONE
Telephone call  10/12/2001 DONE
permit ready
Sprinkler Plan Check10/10/2001 10/11/2001 PASS
DetailsBill Alexander
PLANS/APPL TAKEN TO FRONT DESK  10/11/2001 DONE
DetailsBill Alexander
Plan assigned to (Bill)8/13/2001 10/4/2001 DONE
10/4/2001 14:06:15 SLR - activity updated through activity FIRA22 from case FIR01-00338.
Sprinkler Plan Check9/26/2001 10/3/2001 FAIL
DetailsBill Alexander
2nd review did not answer many for the first review requirements. Did not meet UFC 79 and 80 for water density requirements with storage system and quantities. Will require an approved FPE verification. (UFC103.1.2)
Sprinkler Plan Check8/13/2001 8/21/2001 FAIL
DetailsBill Alexander
Plans and system/s are not verified to meet minimum design requirements to verify protection per the UFC through minimum requirements of 1001.3, and NFPA Chapter 7.
Miscellaneous action  8/21/2001 DONE
Denied plans and calcs taken to the front desk for returning.
Telephone call  8/21/2001 DONE
Faxed copy of review to Treasure Valley Fire Protection 8:45am.
Telephone call  8/21/2001 DONE
denied plans.
Application received  8/13/2001  
Case Summary    DONE
Case Summary    DONE