Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberFIR01-00460
StatusFinaled
Name TREASURE VALLEY FIRE
Site Address 2999 N LAKEHARBOR LN
Project NameSPR IDAHO ATHLETIC CLUB 2 & 3
Customer Number 
ePlanReview 
Description
IDAHO ATHLETIC CLUB ADDITION (PHASES II & III) - TO EXTEND AND MAKE REQUIRED CHANGES TO THE EXISTING FIRE SPRINKLER SYSTEM, INSTALLED UNDER PHASE 1 (FIR01-00125) INTO THE FINAL TWO PHASES OF THE NEW IDAHO ATHLETIC CLUB. PHASE II IS A 11,700 FT/2, TWO STORY ADDITION AT THE WEST SIDE OF THE EXISTING PHASE 1. THE FIRST FLOOR OF PHASE TWO IS A SHELL AND CORE FOR THE FUTURE POOL ROOM. THE SECOND FLOOR WILL BE FINISHED AS AN EXERCISE ROOM. FIRST FLOOR: 5,850 FT/2, SECOND FLOOR: 5,850 FT/2. PHASE THREE IS A 10,370 FT/2, TWO STORY ADDITION AT THE EAST SIDE OF THE EXISTING PHASE 1 BUILDING. THE FIRST FLOOR IS A SHELL ONLY FOR FUTURE OFFICE AND RETAIL SPACE. THE SECOND FLOOR IS A SHELL ONLY FOR A FUTURE EXERCISE ROOM. FIRST FLOOR: 5,270 FT/2, SECOND FLOOR: 5,100 FT/2. BOTH PHASES ARE MASONRY EXTERIOR WALL, CONCRETE FLOORS AND STRUCTURAL ROOF FRAMING WITH METAL ROOF DECK. ALL PHASES OF THIS BUILDING ARE FULLY FIRE SPRINKLERED. THE SPRINKLERS ARE BEING USED FOR ONE-HOUR SUBSTITUTION. FIRE SPRINKLERS INSTALLATION IS PER PLANS, ATTACHED REVIEW NOTES, UFC-1997, NFPA 13-1999, 72-1999 AND ADOPTED BOISE CITY ORDINANCES, ALL AS REGULATED BY THE BOISE FIRE DEPARTMENT. THIS PERMIT IS ATTACHED TO BLD01-01014.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection11/12/200111/13/200111/13/2001APASS
DetailsTroy Cobbley
OK for perm occ. 11/13/2001 1:09:38 PM
DOC - Permit Finaled11/13/200111/13/200111/13/2001PPASS
DetailsTroy Cobbley
Finaled by inspector at 11/13/2001 1:09:47 PM
INSP-Sprinkler Rough-in/Hydro11/7/200111/7/200111/7/2001PPASS
DetailsTroy Cobbley
Rough-in OK on 1st and 2nd floors north and south areas. Hydro test on same systems OK 11/8/2001 2:40:30 PM
INSP-Sprinkler Rough-in/Hydro10/31/200110/31/200110/31/2001PFAIL
DetailsTroy Cobbley
Hydro test failed for 2nd floor south. Contractor to reschedule 10/31/2001 2:49:32 PM
INSP-Sprinkler Rough-in/Hydro10/19/200110/22/200110/22/2001APART
DetailsTroy Cobbley
Inspection was for hydro only on 1st flr. south area. Hydro OK 10/24/2001 8:26:33 AM
Issue and Print Permit  8/29/2001 DONE
Inspection Record Card- Fire8/28/2001 8/28/2001 DONE
Telephone call  8/28/2001 DONE
Plan assigned to (Bill)8/23/2001 8/28/2001 DONE
8/28/2001 14:53:36 JWA - activity updated through activity FIRA22 from case FIR01-00460.
Sprinkler Plan Check8/20/2001 8/28/2001 PASS
DetailsBill Alexander
PLANS/APPL TAKEN TO FRONT DESK  8/28/2001 DONE
DetailsBill Alexander
Application received  8/23/2001  
Case Summary    DONE