INSP-Final Inspection | 11/12/2001 | 11/13/2001 | 11/13/2001 | A | PASS |
Troy Cobbley
|
|
|
OK for perm occ. 11/13/2001 1:09:38 PM
|
DOC - Permit Finaled | 11/13/2001 | 11/13/2001 | 11/13/2001 | P | PASS |
Troy Cobbley
|
|
|
Finaled by inspector at 11/13/2001 1:09:47 PM
|
INSP-Sprinkler Rough-in/Hydro | 11/7/2001 | 11/7/2001 | 11/7/2001 | P | PASS |
Troy Cobbley
|
|
|
Rough-in OK on 1st and 2nd floors north and south areas. Hydro test on same systems OK 11/8/2001 2:40:30 PM
|
INSP-Sprinkler Rough-in/Hydro | 10/31/2001 | 10/31/2001 | 10/31/2001 | P | FAIL |
Troy Cobbley
|
|
|
Hydro test failed for 2nd floor south. Contractor to reschedule 10/31/2001 2:49:32 PM
|
INSP-Sprinkler Rough-in/Hydro | 10/19/2001 | 10/22/2001 | 10/22/2001 | A | PART |
Troy Cobbley
|
|
|
Inspection was for hydro only on 1st flr. south area. Hydro OK 10/24/2001 8:26:33 AM
|
Issue and Print Permit | | | 8/29/2001 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/28/2001 | | 8/28/2001 | | DONE |
|
|
|
|
Telephone call | | | 8/28/2001 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 8/23/2001 | | 8/28/2001 | | DONE |
|
|
|
8/28/2001 14:53:36 JWA - activity updated through activity FIRA22 from case FIR01-00460.
|
Sprinkler Plan Check | 8/20/2001 | | 8/28/2001 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/28/2001 | | DONE |
Bill Alexander
|
|
|
|
Application received | | | 8/23/2001 | | |
|
|
|
|
Case Summary | | | | | DONE |
|
|
|
|