INSP-Final Inspection | 1/17/2002 | 1/17/2002 | 1/17/2002 | P | PASS |
Troy Cobbley
|
|
|
Added by Inspector: 430 On 1/17/2002 2:01:44 PM Shell and core sprinkler system finaled
|
DOC - Permit Finaled | 1/17/2002 | 1/17/2002 | 1/17/2002 | P | PASS |
Troy Cobbley
|
|
|
Finaled by inspector at 1/17/2002 2:02:42 PM
|
INSP-Sprinkler Rough-in/Hydro | 11/29/2001 | 11/30/2001 | 11/30/2001 | A | PART |
Troy Cobbley
|
|
|
AAA Office is OK to cover after additional EQ braces are added. No other areas were inspected 11/30/2001 9:03:44 AM
|
Issue permit | | | 10/15/2001 | | DONE |
|
|
|
|
Sprinkler Plan Check | 10/11/2001 | | 10/12/2001 | | DONE |
Bill Alexander
|
|
|
System modification-Entry Way
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/12/2001 | | DONE |
Bill Alexander
|
|
|
|
Inspection Record Card- Fire | 10/12/2001 | | 10/12/2001 | | DONE |
|
|
|
|
Telephone call | | | 10/12/2001 | | DONE |
|
|
|
left mess that permit is ready
|
Inspection Record Card- Fire | 9/20/2001 | | 9/20/2001 | | DONE |
|
|
|
|
Telephone call | | | 9/20/2001 | | DONE |
|
|
|
|
Issue and Print Permit | | | 9/20/2001 | | DONE |
|
|
|
|
Sprinkler Plan Check | 9/19/2001 | | 9/19/2001 | | PASS |
Bill Alexander
|
|
|
With verifications
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/19/2001 | | DONE |
Bill Alexander
|
|
|
|
Plan assigned to (Bill) | 9/4/2001 | | 9/18/2001 | | DONE |
|
|
|
9/18/2001 15:19:33 JWA - activity updated through activity FIRA22 from case FIR01-00475.
|
Sprinkler Plan Check | 9/4/2001 | | 9/18/2001 | | FAIL |
Bill Alexander
|
|
|
Attic sprinkler heads used out of listing. Verify piping, calculations, etc.
|
Telephone call | | | 9/18/2001 | | DONE |
|
|
|
Faxed copy of failed review comments (3:15 pm)
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/18/2001 | | FAIL |
|
|
|
Returned for resubmittal requirements
|
Application received | | | 9/4/2001 | | |
|
|
|
|
Case Summary | | | | | DONE |
|
|
|
|