INSP-Final Inspection | 7/1/2002 | 7/1/2002 | 7/1/2002 | P | PASS |
Rick Jackson
|
|
|
Added by Inspector: 409 On 7/1/2002 2:54:04 PM
|
DOC - Permit Finaled | 7/1/2002 | 7/1/2002 | 7/1/2002 | P | PASS |
Rick Jackson
|
|
|
Finaled by inspector at 7/1/2002 2:55:39 PM
|
INSP-Final Inspection | 6/20/2002 | 6/20/2002 | 6/20/2002 | P | FAIL |
Rick Jackson
|
|
|
###-#### tested alarm horns - okay; need sprinkler bell working; 6/20/2002 4:33:17 PM
|
Issue permit | | | 11/15/2001 | | DONE |
|
|
|
|
Telephone call | | | 11/14/2001 | | DONE |
|
|
|
left mess for jim that permits are ready
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/9/2001 | | PASS |
|
|
|
|
Alarm Plan Check | 11/9/2001 | | 11/9/2001 | | PASS |
|
|
|
3rd review, acceptable with battery calc revisions made 11/9/01.
|
Alarm Plan Check | | | 10/17/2001 | | FAIL |
|
|
|
Response letter dated 9/26 and additional information submitted 10/15, from Apex reviewed and revised comments added to original review letter. Plan resubmittal still required.
|
Alarm Plan Check | | | 9/21/2001 | | FAIL |
|
|
|
review comments faxed to applicant/designer, James Mesplay, Apex Engineering. These review coments apply to all FA permits associated with the River Quarry Apts complex.
|
Plan assigned to (SAM) | 9/6/2001 | | 9/13/2001 | | DONE |
|
|
|
9/13/2001 13:29:20 JWA - activity updated through activity FIRA22 from case FIR01-00422.
|
Application received | | | 9/6/2001 | | |
|
|
|
|