INSP-Final Inspection | 11/26/2002 | 11/27/2002 | 11/27/2002 | A | PASS |
Rick Jackson
|
|
|
forest says its not finaled yet ###-#### trip test of all dry systems completed; all under a minute 11/27/2002 2:09:42 PM
|
INSP-Alarm Testing | 9/26/2002 | 9/27/2002 | 9/27/2002 | A | NR |
Rick Jackson
|
|
|
###-#### willreschedule for next week; need additional personnel to test 9/27/2002 10:11:34 AM
|
INSP-Sprinkler Rough-in/Hydro | 9/20/2002 | 9/23/2002 | 9/23/2002 | P | PART |
Rick Jackson
|
|
|
###-#### hydro okay on the five systems; still need to trip test 9/23/2002 3:40:02 PM
|
INSP-Final Inspection | 9/11/2002 | 9/13/2002 | 9/13/2002 | P | FAIL |
Rick Jackson
|
|
|
###-#### attempted hydro on all systems; numerous leaks; will try again next week 9/16/2002 8:34:35 AM
|
DOC - Permit Finaled | 2/13/2002 | 2/13/2002 | 2/13/2002 | A | PASS |
Rick Jackson
|
|
|
Finaled by inspector at 2/13/2002 10:23:25 AM
|
INSP-Final Inspection | 1/9/2002 | 1/10/2002 | 1/10/2002 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 01/09/2002 at 15:05:57. Contact: ###-####. all tampers/flows, etc tested okay. need to add head in small room in basement and additional drain 1/10/2002 12:06:58 PM
|
INSP-Sprinkler Rough-in/Hydro | 1/3/2002 | 1/4/2002 | 1/4/2002 | P | PART |
Rick Jackson
|
|
|
Scheduled by Inspector: 409 On 1/3/2002 2:41:40 PM last riser passed 24 hour air test 1/4/2002 3:02:34 PM
|
INSP-Sprinkler Rough-in/Hydro | 1/3/2002 | 1/3/2002 | 1/3/2002 | P | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 01/03/2002 at 10:48:01. Contact: ###-####. start of 24 hr test of last system on riser 4 1/3/2002 2:46:35 PM
|
INSP-Sprinkler Rough-in/Hydro | 12/27/2001 | 12/28/2001 | 12/28/2001 | A | PART |
Rick Jackson
|
|
|
Scheduled by Inspector: 409 On 12/27/2001 1:06:04 PM all air test complete except the system for floor two 12/28/2001 9:02:39 AM
|
INSP-Sprinkler Rough-in/Hydro | 12/26/2001 | 12/26/2001 | 12/27/2001 | P | FAIL |
Rick Jackson
|
|
|
###-#### slope of mains on south side on all floors not sloped back to east sides; air test started at 8:00 am for three risers on west wall of riser room - will return on 11/28 at 8 am 12/27/2001 1:08:29 PM
|
CHANGE STATUS TO (ISS) | | | 12/26/2001 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 12/21/2001 | | 12/21/2001 | | DONE |
|
|
|
|
Telephone call | | | 12/21/2001 | | DONE |
|
|
|
left mess that permit is ready
|
Sprinkler Plan Check | 12/17/2001 | | 12/20/2001 | | PASS |
Bill Alexander
|
|
|
1st floor tenant changes affecting sprinkler protection.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/20/2001 | | DONE |
Bill Alexander
|
|
|
|
INSP-Sprinkler Rough-in | 12/11/2001 | 12/11/2001 | 12/11/2001 | P | FAIL |
Rick Jackson
|
|
|
###-#### need comments for approved plans; plans on site but no comments - couldn't locate comments 12/12/2001 4:59:05 AM
|
Issue permit | | | 12/11/2001 | | DONE |
|
|
|
|
Telephone call | | | 11/28/2001 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 11/28/2001 | | 11/28/2001 | | DONE |
|
|
|
|
Sprinkler Plan Check | 11/21/2001 | | 11/27/2001 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/27/2001 | | DONE |
Bill Alexander
|
|
|
|
Issue permit | | | 9/27/2001 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 9/26/2001 | | 9/26/2001 | | DONE |
|
|
|
|
Telephone call | | | 9/26/2001 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 9/13/2001 | | 9/26/2001 | | DONE |
|
|
|
9/26/2001 14:44:54 JWA - activity updated through activity FIRA22 from case FIR01-00504.
|
Sprinkler Plan Check | 9/13/2001 | | 9/26/2001 | | PART |
Bill Alexander
|
|
|
Requires conditions of a resubmittal. Plans not stamped approved!
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/26/2001 | | DONE |
Bill Alexander
|
|
|
First (preliminary approval)
|
Application received | | | 9/13/2001 | | |
|
|
|
|
Case Summary | | | | | DONE |
|
|
|
|
Case Summary | | | | | DONE |
|
|
|
|