INSP-Final Inspection | 3/28/2002 | 3/28/2002 | 3/28/2002 | P | PASS |
Rick Jackson
|
|
|
Added by Inspector: 409 On 3/28/2002 5:23:09 PM
|
DOC - Permit Finaled | 3/28/2002 | 3/28/2002 | 3/28/2002 | P | PASS |
Rick Jackson
|
|
|
Finaled by inspector at 3/28/2002 5:23:39 PM
|
INSP-Supply line flush | 11/16/2001 | 11/19/2001 | 11/19/2001 | A | PASS |
Troy Cobbley
|
|
|
Supply line flush OK. 11/19/2001 9:02:24 AM
|
INSP-Sprinkler Rough-in | 11/19/2001 | 11/19/2001 | 11/19/2001 | A | PASS |
Troy Cobbley
|
|
|
Added by Inspector: 430 On 11/19/2001 9:03:21 AM Sprinkler rough-in OK
|
INSP-Sprinkler Rough-in/Hydro | 11/19/2001 | 11/19/2001 | 11/19/2001 | A | PASS |
Troy Cobbley
|
|
|
Added by Inspector: 430 On 11/19/2001 10:54:05 AM Above ground hydro test OK.
|
INSP-Supply line flush | 10/19/2001 | 10/19/2001 | 10/19/2001 | P | PASS |
Troy Cobbley
|
|
|
OK to cover rest of underground line 10/19/2001 1:57:13 PM
|
INSP-Sprinkler Rough-in | 10/9/2001 | 10/9/2001 | 10/9/2001 | P | PART |
Joe Tawney
|
|
|
OK to cover 10' out only 10/10/2001 9:33:03 AM
|
Issue permit | | | 10/5/2001 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 10/4/2001 | | 10/4/2001 | | DONE |
|
|
|
|
Telephone call | | | 10/4/2001 | | DONE |
|
|
|
left mess that permit is ready
|
Plan assigned to (Bill) | 9/26/2001 | | 10/4/2001 | | DONE |
|
|
|
10/4/2001 13:06:46 JWA - activity updated through activity FIRA22 from case FIR01-00521.
|
Sprinkler Plan Check | 9/26/2001 | | 10/4/2001 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/4/2001 | | DONE |
Bill Alexander
|
|
|
|
Application received | | | 9/26/2001 | | |
|
|
|
|
Case Summary | | | | | DONE |
|
|
|
|