DOC - Permit Finaled | 2/12/2002 | 2/12/2002 | 2/12/2002 | P | PASS |
Troy Cobbley
|
|
|
Added by Inspector: 430 On 2/12/2002 4:52:24 PM Fire alarm system finaled
|
DOC - Permit Finaled | 2/8/2002 | 2/8/2002 | 2/8/2002 | P | PASS |
Troy Cobbley
|
|
|
Added by Inspector: 430 On 2/8/2002 12:39:14 PM Fire sprinkler system finaled
|
Sprinkler Plan Check | 2/7/2002 | | 2/7/2002 | | PASS |
Bill Alexander
|
|
|
3rd floor records storage room sprinkler change to apply OH spacing.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/7/2002 | | DONE |
Bill Alexander
|
|
|
3rd floor records storage room sprinkler change to apply OH spacing.
|
Telephone call | | | 2/7/2002 | | DONE |
|
|
|
permit is ready-no fees per bill/2/7/02/mls
|
FIR-Aging Inspection | 2/1/2002 | 2/1/2002 | 2/1/2002 | | NR |
Troy Cobbley
|
|
|
work in progress 2/1/2002 8:55:10 AM
|
INSP-Sprinkler Rough-in/Hydro | 1/23/2002 | 1/23/2002 | 1/23/2002 | P | PASS |
Troy Cobbley
|
|
|
hydro test for the 2nd floor T.I. is OK 1/23/2002 4:45:30 PM
|
INSP-Sprinkler Rough-in/Hydro | 1/9/2002 | 1/9/2002 | 1/9/2002 | P | PART |
Troy Cobbley
|
|
|
Added by Inspector: 430 On 1/9/2002 2:15:47 PM Ok to install ceiling tile in rooms with heads cut in at this date. I notified contractor to call for reinspection for all other areas when sprinkler heads are installed
|
INSP-Final Inspection | 1/8/2002 | 1/8/2002 | 1/8/2002 | P | PART |
Troy Cobbley
|
|
|
Third floor hydro test OK. OK to install ceiling tiles. 3rd floor shell system and T.I. hangers OK 1/8/2002 4:04:45 PM
|
FIR-Aging Inspection | 1/7/2002 | 1/7/2002 | 1/7/2002 | | NR |
Troy Cobbley
|
|
|
work in progress 1/7/2002 3:52:14 PM
|
Issue and Print Permit | | | 10/8/2001 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 10/5/2001 | | 10/5/2001 | | DONE |
|
|
|
|
Telephone call | | | 10/5/2001 | | DONE |
|
|
|
talked to brad to verify plans are ready
|
Plan assigned to (Bill) | 9/27/2001 | | 10/4/2001 | | DONE |
|
|
|
10/4/2001 15:11:12 JWA - activity updated through activity FIRA22 from case FIR01-00522.
|
Sprinkler Plan Check | 9/28/2001 | | 10/4/2001 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/4/2001 | | DONE |
Bill Alexander
|
|
|
|
Application received | | | 9/27/2001 | | |
Bill Alexander
|
|
|
|
Case Summary | | | | | DONE |
|
|
|
|