INSP-Final Inspection | 2/28/2003 | 2/28/2003 | 2/28/2003 | P | PASS |
Troy Cobbley
|
|
|
fire alarm finaled 2/28/2003 2:06:00 PM
|
DOC - Permit Finaled | 2/28/2003 | 2/28/2003 | 2/28/2003 | P | PASS |
Troy Cobbley
|
|
|
Finaled by inspector at 2/28/2003 2:06:06 PM
|
INSP-Final Inspection | 2/18/2003 | 2/20/2003 | 2/20/2003 | A | FAIL |
Troy Cobbley
|
|
|
provide a/v's in the kitchen area and provide a 60cd a/v in the dining area 2/20/2003 12:04:35 PM
|
FIR-Aging Inspection | 12/9/2002 | 12/9/2002 | 12/9/2002 | | NR |
Troy Cobbley
|
|
|
I spoke with the general contractor by phone and he stated that the fire alarm and the fire sprinkler work was still in progress but had been delayed by the hospital due to funding for the project 12/9/2002 3:58:26 PM
|
Issue permit | | | 1/4/2002 | | DONE |
|
|
|
|
Telephone call | | | 1/2/2002 | | DONE |
|
|
|
left mess for jon that permit is ready
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/31/2001 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 12/31/2001 | | 12/31/2001 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 11/2/2001 | | 12/31/2001 | | DONE |
|
|
|
12/31/2001 15:36:22 SLR - activity updated through activity FIRA22 from case FIR01-00577.
|
Alarm Plan Check | 12/24/2001 | | 12/30/2001 | | PASS |
|
|
|
RESUBMITTAL ACCEPTABLE
|
Alarm Plan Check | | | 11/19/2001 | | FAIL |
|
|
|
review discussed with and faxed to Jon Gorsanson, DC Engineering.
|
Application received | | | 11/2/2001 | | |
|
|
|
|