INSP-Alarm Testing | 3/27/2002 | 3/28/2002 | 3/28/2002 | P | PASS |
Troy Cobbley
|
|
|
fire alarm finaled 3/28/2002 3:38:11 PM
|
DOC - Permit Finaled | 3/28/2002 | 3/28/2002 | 3/28/2002 | P | PASS |
Troy Cobbley
|
|
|
Finaled by inspector at 3/28/2002 3:38:16 PM
|
INSP-Final Inspection | 3/26/2002 | 3/27/2002 | 3/27/2002 | P | PART |
Troy Cobbley
|
|
|
inspection not complete, I marked the devices on the approved plans that have been tested(duct detectors) 3/27/2002 5:25:45 PM
|
Inspection Record Card- Fire | 3/26/2002 | | 3/26/2002 | | DONE |
|
|
|
|
Telephone call | | | 3/26/2002 | | DONE |
|
|
|
CALLED ROB PLANS READY 3-26-02 ///DLD
|
Issue and Print Permit | | | 3/26/2002 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 11/13/2001 | | 3/25/2002 | | DONE |
|
|
|
3/25/2002 17:23:10 SLR - activity updated through activity FIRA22 from case FIR01-00590.
|
Alarm Plan Check | | | 3/25/2002 | | PASS |
|
|
|
Resumbittal received 3/14/02 accceptable.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/25/2002 | | DONE |
|
|
|
|
Alarm Plan Check | | | 3/12/2002 | | FAIL |
|
|
|
Revised plans received 3/7/02 are still incomplete. Review faxed to Protex; deficiencies discussed by phone with Rob Ahten on 3/13.
|
INSP-Alarm Testing | 3/7/2002 | 3/8/2002 | 3/8/2002 | A | FAIL |
Troy Cobbley
|
|
|
no approved drawings on site. No inspection performed 3/8/2002 9:49:48 AM
|
INSP-Final Inspection | 3/6/2002 | 3/7/2002 | 3/7/2002 | P | FAIL |
Troy Cobbley
|
|
|
circuit wiring to duct detectors had been cut and needs repaired. Inspection stopped and not complete 3/7/2002 4:29:19 PM
|
Application received | | | 11/13/2001 | | |
|
|
|
|
Alarm Plan Check | | | 10/23/2001 | | FAIL |
|
|
|
Review comments faxed to Protex, Rob Ahten.
|