INSP-Sprinkler Rough-in/Hydro | 5/1/2002 | 5/2/2002 | 5/2/2002 | A | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 05/01/2002 at 15:02:21. Contact: ###-####. UG hydro okay 5/2/2002 12:17:03 PM
|
INSP-Final Inspection | 5/2/2002 | 5/2/2002 | 5/2/2002 | P | PASS |
Rick Jackson
|
|
|
Added by Inspector: 409 On 5/2/2002 12:17:20 PM
|
DOC - Permit Finaled | 5/2/2002 | 5/2/2002 | 5/2/2002 | P | PASS |
Rick Jackson
|
|
|
Finaled by inspector at 5/2/2002 12:17:27 PM
|
INSP-Sprinkler Rough-in/Hydro | 5/1/2002 | 5/2/2002 | 5/1/2002 | P | CANC |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 05/01/2002 at 14:08:47. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 05/01/2002 at 14:58:50.
|
Telephone call | | | 1/11/2002 | | DONE |
|
|
|
talked to ross faris-does not need plans
|
INSP-Sprinkler Rough-in/Hydro | 12/20/2001 | 12/21/2001 | 12/21/2001 | A | PART |
Rick Jackson
|
|
|
Ok to cover after removing concrete on riser ell down to expose bolts and hard cover protection of supply connection (potential contamination).
|
Inspection Record Card- Fire | 12/21/2001 | | 12/21/2001 | | DONE |
|
|
|
|
Issue permit | | | 12/7/2001 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 12/6/2001 | | 12/6/2001 | | DONE |
|
|
|
|
Telephone call | | | 12/6/2001 | | DONE |
|
|
|
permit ready
|
Plan assigned to (Bill) | 11/30/2001 | | 12/6/2001 | | DONE |
|
|
|
12/6/2001 16:09:35 JWA - activity updated through activity FIRA22 from case FIR01-00605.
|
Sprinkler Plan Check | 12/6/2001 | | 12/6/2001 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/6/2001 | | DONE |
Bill Alexander
|
|
|
|
Sprinkler Plan Check | 11/30/2001 | | 12/4/2001 | | FAIL |
Bill Alexander
|
|
|
Lack plan requirements of NFPA 24:1-4 and 13:8-1.
|
Miscellaneous action | | | 12/4/2001 | | DONE |
Bill Alexander
|
|
|
Returned failed plans to front desk with review notes to return to Debest.
|
Application received | | | 11/30/2001 | | |
|
|
|
|
Case Summary | | | | | DONE |
|
|
|
|