INSP-Sprinkler Rough-in/Hydro | 1/16/2002 | 1/17/2002 | 1/17/2002 | P | PASS |
Troy Cobbley
|
|
|
fire sprinkler system finaled 1/17/2002 4:14:26 PM
|
DOC - Permit Finaled | 1/17/2002 | 1/17/2002 | 1/17/2002 | P | PASS |
Troy Cobbley
|
|
|
Finaled by inspector at 1/17/2002 4:14:45 PM
|
INSP-Final Inspection | 1/14/2002 | 1/16/2002 | 1/16/2002 | P | CANC |
Troy Cobbley
|
|
|
canceled by contractor 1/15/2002 4:05:02 PM
|
INSP-Final Inspection | 1/14/2002 | 1/16/2002 | 1/15/2002 | A | CANC |
Troy Cobbley
|
|
|
###-#### TROY\\not ready
|
INSP-Sprinkler Rough-in/Hydro | 1/9/2002 | 1/10/2002 | 1/10/2002 | A | PART |
Troy Cobbley
|
|
|
OK to install ceiling tile in areas with sprinkler heads. New areas will need to be inspected when finished. Add upright sprinkler head in east corridor in front of restrooms 1/10/2002 9:11:56 AM
|
Issue permit | | | 12/14/2001 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 12/13/2001 | | 12/13/2001 | | DONE |
|
|
|
|
Telephone call | | | 12/13/2001 | | DONE |
|
|
|
talked to brad to verify plans are ready
|
Plan assigned to (Bill) | 12/11/2001 | | 12/13/2001 | | DONE |
|
|
|
12/13/2001 10:29:55 JWA - activity updated through activity FIRA22 from case FIR01-00616.
|
Sprinkler Plan Check | 12/11/2001 | | 12/13/2001 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/13/2001 | | DONE |
Bill Alexander
|
|
|
|
Application received | | | 12/11/2001 | | |
|
|
|
|
Case Summary | | | | | DONE |
|
|
|
|