Permit Information
Permit NumberFIR01-00624
StatusFinaled
Name TREASURE VALLEY BIBILE CHURCH
Site Address 12251 W USTICK RD
Project NameSPR TREASURE VALLEY BIBLE UG
Customer Number 
ePlanReview 
Description
To install approximately 292'-0" of C-900 from a new 6" supply installed by United Water at the North property line off Ustick, into the South West corner of the future construction of a new 30,522 ft/2, "Treasure Valley Bible" church. The underground riser is to be Ductile Iron up through the floor with an 11" transitional flange. This work shall meet the minimum installation requirements of NFPA 24-1995 and related, NFPA 13-1999 as regulated by the Department thru the UFC. No overhead fire sprinkler work is allowed under this permit. This permit must be complete, prior to connection of the overhead permit work (which has not been reviewed or issued as of this date). This permit is attached to the grading permit: BLD01-02392. Building permit is: BLD01-02399.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIR-Aging Inspection10/21/200510/21/200510/23/2005 PASS
DetailsTroy Cobbley
INSP-Final Inspection10/23/200510/23/200510/23/2005PPASS
DetailsTroy Cobbley
Permit finaled
FIR-Aging Inspection8/17/20058/17/20058/17/2005 PASS
DetailsTroy Cobbley
Permit finaled
FIR-Aging Inspection8/17/20058/17/20058/17/2005PPASS
DetailsTroy Cobbley
Permit finaled
FIR-Aging Inspection6/14/20056/14/20056/14/2005 PASS
DetailsTroy Cobbley
Permit finaled
INSP-Sprinkler Rough-in/Hydro7/22/20027/22/20027/22/2002PPASS
DetailsTroy Cobbley
above ground hydro test OK 7/22/2002 3:23:38 PM
INSP-Sprinkler Rough-in/Hydro7/9/20027/10/20027/10/2002AFAIL
DetailsTroy Cobbley
this inspection was done under FIR02-00039 7/10/2002 9:02:03 AM
INSP-Sprinkler Rough-in/Hydro7/1/20027/2/20027/2/2002AFAIL
DetailsTroy Cobbley
approved plans not on site for reinspection and the access panels to the attic space are screwed shut 7/2/2002 9:43:21 AM
INSP-Sprinkler Rough-in/Hydro7/1/20027/1/20027/1/2002PPART
DetailsTroy Cobbley
air test on dry system OK 7/2/2002 3:59:35 PM
INSP-Sprinkler Rough-in/Hydro6/12/20026/13/20026/13/2002AFAIL
DetailsTroy Cobbley
See the onsite approved plans for the specific locations for the heads that are over spaced in the overbuilds and off of the draftstops, pipe is leaking, heads more than 6" off of the peak 6/13/2002 11:50:26 AM
INSP-Sprinkler Rough-in/Hydro6/13/20026/13/20026/13/2002APASS
DetailsTroy Cobbley
Dry system hydro test OK
INSP-Supply line flush6/12/20026/12/20026/12/2002PPASS
DetailsTroy Cobbley
underground flush ok 6/12/2002 10:51:14 AM
INSP-Sprinkler Rough-in6/5/20026/6/20026/6/2002ACANC
DetailsTroy Cobbley
This inspection done under FIR02-00039 6/7/2002 11:45:22 AM
INSP-Sprinkler Rough-in6/3/20026/4/20026/4/2002AFAIL
DetailsRick Jackson
JOHN ###-#### wrong permit number called in - see FIR02-00039 6/4/2002 10:25:51 AM
INSP-Sprinkler Rough-in/Hydro5/7/20025/7/20025/7/2002PCANC
DetailsTroy Cobbley
This inspection done under FIR02-00039 5/8/2002 9:46:10 AM
INSP-Sprinkler Rough-in/Hydro2/1/20022/1/20022/1/2002PPART
DetailsTroy Cobbley
Underground fire line is OK for cover 2/1/2002 3:40:43 PM
Issue and Print Permit  1/23/2002 DONE
Inspection Record Card- Fire1/23/2002 1/23/2002 DONE
Telephone call  1/22/2002 DONE
talked to rudy to verify plans are ready
Sprinkler Plan Check1/18/2002 1/18/2002 PASS
DetailsBill Alexander
Modified UG supply-w/letter of consent from Civil Engineer, that original design is allowed to be modified, due to United Water's request. Received email notification from: Bob Unger @ Hubble Engineers, Senior Project Manager, 01/18/2002.
PLANS/APPL TAKEN TO FRONT DESK  1/18/2002 DONE
DetailsBill Alexander
Sprinkler Plan Check1/7/2002 1/7/2002 FAIL
DetailsBill Alexander
UG piping modifications to original review dated 12/20/2001, lacking the fittings and controls for future developement as originally approved. Request verification of approval from Architect or Civil Engineer prior to acceptance.
Issue permit  12/21/2001 DONE
Sprinkler Plan Check12/18/2001 12/20/2001 PASS
DetailsBill Alexander
Inspection Record Card- Fire12/20/2001 12/20/2001 DONE
Telephone call  12/20/2001 DONE
left mess that permit is ready
Application received  12/20/2001  
Plan assigned to (Bill)12/18/2001 12/20/2001 PASS
DetailsBill Alexander
Reference attached notes
PLANS/APPL TAKEN TO FRONT DESK  12/20/2001 DONE
DetailsBill Alexander
Case Summary    DONE
Case Summary    DONE