FIR-Aging Inspection | 10/21/2005 | 10/21/2005 | 10/23/2005 | | PASS |
Troy Cobbley
|
|
|
|
INSP-Final Inspection | 10/23/2005 | 10/23/2005 | 10/23/2005 | P | PASS |
Troy Cobbley
|
|
|
Inspection finaled 10/21/05
|
INSP-Final Inspection | 10/21/2005 | 10/21/2005 | 10/21/2005 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
FIR-Aging Inspection | 8/17/2005 | 8/17/2005 | 8/17/2005 | | PASS |
Troy Cobbley
|
|
|
permit finaled
|
FIR-Aging Inspection | 6/14/2005 | 6/14/2005 | 6/15/2005 | | DONE |
Troy Cobbley
|
|
|
I left message on Brad Turks voice mail requesting the status of this job.
|
INSP-Final Inspection | 8/2/2002 | 8/6/2002 | 8/6/2002 | A | CANC |
Troy Cobbley
|
|
|
Scheduled by a contractor via Hello! on 08/02/2002 at 08:34:54. Contact: .
inspection not done due to no contact number being given. With the site being HP I can't get beyond the security office without a chaperone. 8/6/2002 4:28:13 PM
|
Miscellaneous action | | | 4/29/2002 | | DONE |
|
|
|
4 hrs of inspections done after hour at 42.00 for each hour.
|
INSP-Alarm Testing | 4/22/2002 | 4/25/2002 | 4/25/2002 | P | FAIL |
Troy Cobbley
|
|
|
provide ceiling listed horn/strobe, relocate heat detector to within 2' of sprinkler head on first floor and adjust all fire doors so that they latch 4/26/2002 7:21:15 AM
|
Inspection Record Card- Fire | 1/11/2002 | | 1/11/2002 | | DONE |
|
|
|
|
Telephone call | | | 1/11/2002 | | DONE |
|
|
|
left mess that permit is ready
|
Issue permit | | | 1/11/2002 | | DONE |
|
|
|
|
Alarm Plan Check | | | 1/10/2002 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/10/2002 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 12/20/2001 | | 1/10/2002 | | DONE |
|
|
|
1/10/2002 19:35:10 SLR - activity updated through activity FIRA22 from case FIR01-00625.
|
Telephone call | | | 1/7/2002 | | DONE |
|
|
|
telcon with Bran Graham indicated "middle level" not in this project and was upgraded 3 years ago under a City permit. No work is to be done on "middle level". The submitted circuit diagram and calcualtions Sheet 1) do include the middle level. Agreed this permit will be issued with the 2nd floor excluded.
|
Alarm Plan Check | | | 1/4/2002 | | PEND |
|
|
|
inadequate information regarding the middle level of building. Called simplex who doesn not have information; they suggest holding for clarification from HP.
Left message for John Hatton at HP.
|
Alarm Plan Check | 12/20/2001 | | 12/27/2001 | | HOLD |
|
|
|
Need additional information. Called HP and Simlex, no one available until next week. Hold for further information.
|
Application received | | | 12/20/2001 | | |
|
|
|
|