INSP-Final Inspection | 4/23/2002 | 4/23/2002 | 4/23/2002 | A | PASS |
Troy Cobbley
|
|
|
Fire sprinkler finaled
|
DOC - Permit Finaled | 4/23/2002 | 4/23/2002 | 4/23/2002 | P | PASS |
Troy Cobbley
|
|
|
Finaled by inspector at 4/23/2002 11:48:45 AM
|
INSP-Sprinkler Rough-in/Hydro | 4/11/2002 | 4/12/2002 | 4/12/2002 | A | PASS |
Troy Cobbley
|
|
|
Underground, overhead sprinkler and anti-freeze loop hydro tests OK 4/12/2002 3:52:32 PM
|
INSP-Supply line flush | 4/9/2002 | 4/10/2002 | 4/10/2002 | A | PASS |
Troy Cobbley
|
|
|
flush on underground piping OK 4/10/2002 12:48:45 PM
|
INSP-Supply line flush | 4/9/2002 | 4/9/2002 | 4/9/2002 | P | CANC |
Troy Cobbley
|
|
|
canceled by contractor 4/9/2002 4:25:28 PM
|
INSP-Supply line flush | 3/14/2002 | 3/15/2002 | 3/15/2002 | A | FAIL |
Troy Cobbley
|
|
|
nut and bolt need to be coated before cover up 3/15/2002 12:21:08 PM
|
INSP-Sprinkler Rough-in/Hydro | 3/11/2002 | 3/12/2002 | 3/11/2002 | A | CANC |
Troy Cobbley
|
|
|
Scheduled by a contractor via Hello! on 03/11/2002 at 11:14:25. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 03/11/2002 at 14:18:36.
|
INSP-Sprinkler Rough-in/Hydro | 2/25/2002 | 2/26/2002 | 2/26/2002 | P | FAIL |
Troy Cobbley
|
|
|
add hangers in north rooms and in corridor 2/26/2002 5:04:43 PM
|
INSP-Sprinkler Rough-in/Hydro | 2/8/2002 | 2/8/2002 | 2/8/2002 | P | PART |
Troy Cobbley
|
|
|
reception hall OK for cover 2/8/2002 3:26:58 PM
|
INSP-Sprinkler Rough-in | 2/6/2002 | 2/6/2002 | 2/6/2002 | A | PART |
Troy Cobbley
|
|
|
Added by Inspector: 430 On 2/6/2002 8:34:55 AM The front canopy attic heads to be relocated to within 6" of centerline of peak. Sunroom sprinklers OK for cover
|
INSP-Sprinkler Rough-in | 2/4/2002 | 2/5/2002 | 2/5/2002 | A | PART |
Troy Cobbley
|
|
|
Front canopy OK for cover but approved plans not available 2/5/2002 12:34:23 PM
|
Inspection Record Card- Fire | 1/17/2002 | | 1/17/2002 | | DONE |
|
|
|
|
Telephone call | | | 1/17/2002 | | DONE |
|
|
|
left mess that permit is ready
|
Issue and Print Permit | | | 1/17/2002 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 1/3/2002 | | 1/16/2002 | | DONE |
|
|
|
1/16/2002 11:16:05 SLR - activity updated through activity FIRA22 from case FIR01-00535.
|
Sprinkler Plan Check | 1/15/2002 | | 1/16/2002 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/16/2002 | | DONE |
Bill Alexander
|
|
|
|
Telephone call | | | 1/14/2002 | | DONE |
|
|
|
Received email from John Venche that riser is changing (again) and submitting new calcs. Emailed back that would not accept anymore faxes. Sending complete submittals back (2 seperate submittals of 6 each) to put together and resubmit.
|
Miscellaneous action | | | 1/14/2002 | | DONE |
|
|
|
gave plans back to De Best Fire Protection
|
Sprinkler Plan Check | 1/8/2002 | | 1/14/2002 | | FAIL |
Bill Alexander
|
|
|
01/10/2002- Anti-freeze loop is not located down stream of alarm flow switch. Did not receive required data submittal on expansion chamber for system volumn and chamber calibration.
|
Telephone call | | | 1/10/2002 | | DONE |
Bill Alexander
|
|
|
Faxed revised riser for attachements to the sets.
|
Sprinkler Plan Check | 1/3/2002 | | 1/7/2002 | | FAIL |
Bill Alexander
|
|
|
Site location needs clarified in relation to project. Anti-freeze system incorrectly designed. Clarification of riser test connection required. No inspectors test noted. Need clarification of attic protection with section detail/s. Need piping protection tenting detail for installer/s. Need manufacturer submittals on sprinklers and expansion chamber. One head out of 6, which exceeds spacing pressure density design minimums. Obstructed construction requires clarification of obstruction as outlined in "Cover Sheet". Anti-freeze calculations do not correlate with plan piping.
|
Telephone call | | | 1/7/2002 | | DONE |
Bill Alexander
|
|
|
Faxed copy of requirements in review this date, at 2:30pm, to Debest Fire Protection @ ###-####.
|
Application received | | | 1/3/2002 | | |
|
|
|
|
Case Summary | | | | | DONE |
|
|
|
|