Permit Information
Permit NumberFIR02-00005
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 3201 W AIRPORT WAY
Project NameSPR AIRPORT-NEW TERMINAL
Customer Number 
ePlanReview 
Description
*BOISE AIRPORT PASSENGER TERMINAL BUILDING-OVERHEAD* TO INSTALL COMPLETE FIRE SPRINKLER SYSTEMS WITH FIRE BOOSTER PUMP IN A NEW 311,820 FT/2, THREE STORY AIRPORT PASSENGER TERMINAL BUILDING FACILITY. BASEMENT CONSISTS OF 45,000 FT/2. THE NEW TERMINAL BUILDING WILL BE CONSTRUCTED OF CONCRETE AND STEEL STRUCTURAL FRAME. IT WILL BE FULLY FIRE SPRINKLERED. THIS TERMINAL BUILDING WILL REPLACE THE EXISTING TERMINAL BUILDING. THE PROJECT WILL BE CONSTRUCTED IN PHASES. SCHEDULE I, WILL BE CONSTRUCTED OUTSIDE OF THE EXISTING TERMINAL FOOTPRINT AND WILL INCLUDE THE BASEMENT SUPPORT AREAS, FIRST FLOOR BAGGAGE CLAIM/MAKE-UP, SECOND FLOOR TICKETING, ATO AND LEASE AREAS AND THE THIRD FLOOR ADMINISTRATIVE AND LEASE AREAS. SCHEDULE I ALSO INCLUDES CONSTRUCTION OF TEMPORARY ELEVATED WALKWAYS AND SECURITY CHECKPOINTS CONSTRUCTED OVER THE EXISTING TERMINAL BUILDING, TO CONNECT THE COMPLETED AND OPERATING SCHEDULE I BUILDING WITH THE EXISTING CONCOURSES. SCHEDULE II WILL INCLUDE DEMOLITION OF THE WEST END OF THE EXISTING TERMINAL BUILDING AND THE CONSTRUCTION OF THE FIRST FLOOR RENTAL CAR LOBBY AND GROUND LOAD LOBBY AND SECOND FLOOR SECURITY CHECKPOINT, FOOD COURT AREAS AND PASSENGER LINK TO EXISTING CONCOURSE 'B'. AFTER COMPLETION OF SCHEDULE II, THE REMAINDER OF THE EXISTING TERMINAL BUILDING, THE TEMPORARY ELEVATED WALKWAYS AND CONCOURSE 'A' WILL BE DEMOLISHED AND REMOVED. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED COMMENT LIST. ALL RELATED WORK SHALL BE PER RED-LINED NOTES AND ATTACHED PLAN REVIEW COMMENTS AND CONDITIONS LIST AS REGULATED BY FIRE DEPARTMENT, WHICH COMPRISES AND BECOMES A PART OF THE APPROVED PLANS. A FIRE "INSPECTION CARD" IS REQUIRED AS A CONDITION OF THIS PERMIT, TO PROVIDE WITNESS COMPLIANCE WITH ADOPTED CODES & ORDINANCES. THIS FIRE PERMIT IS ATTACHED TO BUILDING PERMIT: BLD01-03428. UNDERGROUND FIRE PERMIT ISSUED PREVIOUSLY SUPPLYING THIS PERMITTED WORK IS: FIR01-00562.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection11/8/200411/8/200411/8/2004PPASS
DetailsRick Jackson
DOC - Permit Finaled11/8/200411/8/200411/8/2004PPASS
DetailsRick Jackson
Finaled by inspector at 11/8/2004 3:10:20 PM
INSP-Final Inspection10/11/200410/11/200410/11/2004PFAIL
DetailsRick Jackson
brian; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Dry system under walkway trip test okay; need straps on two hangers near stair; need air gauge at dry valve 10/11/2004 1:49:57 PM
INSP-Sprinkler Rough-in/Hydro10/6/200410/6/200410/6/2004PPART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 10/6/2004 at 10:50:55 AM. Contact: ###-####. hydro on dry system under walkway okay 10/6/2004 12:59:01 PM
INSP-Sprinkler Rough-in/Hydro10/4/200410/5/200410/5/2004AFAIL
DetailsRick Jackson
Stop air test 43 psi Fail - air pressure at 38 psi 10/5/2004 11:44:21 AM
INSP-Sprinkler Rough-in/Hydro10/4/200410/4/200410/4/2004PDONE
DetailsRick Jackson
Start 24 hour test 12 pm with 43 psi on dry system under old walkway 10/4/2004 1:37:18 PM
INSP-Sprinkler Rough-in/Hydro9/17/20049/17/20049/17/2004PPART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 9/17/2004 at 8:14:52 AM. Contact: ###-####. Okay in area D and E; the temp walkway dry system is not ready and will require all tests; the walkway sprinkler system must remain in service up until the demo time 9/17/2004 11:47:29 AM
INSP-Sprinkler Rough-in/Hydro9/15/20049/15/20049/15/2004PPART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 9/15/2004 at 8:42:06 AM. Contact: ###-####. ^ inch main from pump room to concourse B hydro only okay 9/15/2004 2:35:24 PM
INSP-Sprinkler Rough-in/Hydro9/10/20049/10/20049/10/2004PPART
DetailsRick Jackson
Dry system for under terminal and walkway okay for hydro; 30 minutes to fill with air at 42 psi 9/10/2004 4:28:49 PM
INSP-Sprinkler Rough-in9/8/20049/8/20049/8/2004AFAIL
DetailsRick Jackson
Dry system air compressor takes over 30 minutes to fill system; need to trip dry system and set air compressor to come on above low air setting 9/8/2004 11:58:33 AM
INSP-Sprinkler Rough-in/Hydro9/3/20049/3/20049/3/2004PFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 9/3/2004 at 10:38:54 AM. Not holding pressure (second floor at SW corner) 9/3/2004 2:19:41 PM
INSP-Sprinkler Rough-in/Hydro8/31/20049/1/20049/1/2004APART
DetailsRick Jackson
Brian; 8:00 Hydro okay for east mechanical room, area D 1st floor and area E basement through 1st floor elevator area 9/1/2004 12:33:15 PM
INSP-Sprinkler Rough-in/Hydro8/30/20048/31/20048/31/2004ACANC
DetailsRick Jackson
Scheduled by a contractor via Hello! on 8/30/2004 at 2:49:20 PM. Contact: ###-####. Rescheduled by inspector for 9/1 8/31/2004 3:06:37 PM
Plan resubmittals received  8/31/2004  
INSP-Sprinkler Rough-in/Hydro8/5/20048/6/20048/6/2004APART
DetailsRick Jackson
Brian - ###-#### Hydro on west mechanical room on roof okay 8/6/2004 1:15:18 PM
INSP-Sprinkler Rough-in8/6/20048/6/20048/6/2004AFAIL
DetailsRick Jackson
Overspaced in roof mechanical room at grid F/5 - G/4 and 9-10 (only area checked) 8/6/2004 10:30:29 AM
INSP-Sprinkler Rough-in/Hydro8/4/20048/5/20048/5/2004PNR
DetailsRick Jackson
brian ; Phone #: ###-#### Internet Inspection Request from: Annette Moore Hydro not holding - rescheduled for 8/6 8/5/2004 2:09:39 PM
INSP-Sprinkler Rough-in/Hydro7/27/20047/27/20047/27/2004APART
DetailsRick Jackson
Area C hydro completed 7/27/2004 2:00:37 PM
INSP-Sprinkler Rough-in/Hydro7/23/20047/26/20047/26/2004PPART
DetailsRick Jackson
Brian; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes Hydro on area C okay; EQ at (3-6 inch lines) expansion joint on second level okay 7/26/2004 2:58:31 PM
INSP-Sprinkler Rough-in6/8/20046/9/20046/10/2004APART
DetailsRick Jackson
###-#### brian okay to cover rotunda only; EQ needed at area by new walkway 6/10/2004 8:53:53 AM
Issue and Print Permit  6/8/2004 DONE
Plan assigned to (Bill)5/28/2004 6/8/2004 DONE
Sprinkler Plan Check5/28/2004 6/8/2004 PASS
DetailsBill Alexander
PLANS/APPL TAKEN TO FRONT DESK  6/8/2004 DONE
Permit Ready to Issue  6/8/2004 DONE
Inspection Record Card- Fire6/8/2004 6/8/2004 DONE
Telephone call  6/8/2004 DONE
left mess that permit is ready
Plan resubmittals received  5/27/2004  
INSP-Sprinkler Rough-in5/26/20045/26/20045/26/2004PPART
DetailsTroy Cobbley
Sprinkler pendants located in area "C" on the second floor west of the sky lights are ok to cover 5/26/2004 3:16:42 PM
INSP-Sprinkler Rough-in5/11/20045/12/20045/12/2004AFAIL
DetailsRick Jackson
Brian; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes Need EQ on 4 inch on either side of skylight as they are overspaced 5/12/2004 11:26:04 AM
INSP-Sprinkler Rough-in4/19/20044/19/20044/19/2004PPART
DetailsRick Jackson
The 2.5 inch line in area D first floor has shifted from plans and branch lines installed per plans; need EQ at west end of 2.5 inch on first floor as it is overspaced from end of pipe; the tie-ins to exsisting mains aren't completed; okay on first floor area C and D - heads/drops not completed 4/19/2004 3:06:57 PM
Miscellaneous action  2/24/2004 DONE
Received a signed (by Dave Miller) aggreement addressing FIR02-00005-10, Items #1 and 2. Forwarded revised review notes with copy of aggreement to Greg Johnson (TVFP), attached (seperately) papers relating to FIR04-00092 (with a note).
Sprinkler Plan Check12/22/2003 1/8/2004 PART
DetailsBill Alexander
Need sprinkler upgrading and earthquake submittals. Reference (permit/plan) attached review notes.
Plan assigned to (Bill)12/22/2003 1/8/2004 DONE
DetailsBill Alexander
PLANS/APPL TAKEN TO FRONT DESK  1/8/2004 DONE
Permit Ready to Issue  1/8/2004 DONE
CHANGE STATUS TO (ISS)  1/8/2004 DONE
already pd for
Plan resubmittals received  12/22/2003 DONE
INSP-Sprinkler Rough-in/Hydro6/3/20036/4/20036/4/2003PPART
DetailsRick Jackson
air test on three systems //// air tests okay; will need map updated to reflect current room numbers; system not left on and operational as it is not monitored by BOI personnel 6/4/2003 2:35:39 PM
INSP-Sprinkler Rough-in/Hydro6/3/20036/3/20036/3/2003PPART
DetailsRick Jackson
sam; Phone #: ###-#### Internet Inspection Request from: Barbara Moore started 24 hr test on three systems 6/3/2003 4:01:51 PM
INSP-Sprinkler Rough-in/Hydro5/28/20035/28/20035/28/2003PPASS
DetailsTroy Cobbley
sam; Phone #: ###-#### Hydro test for dry system area "B" is ok 5/28/2003 4:00:07 PM
INSP-Sprinkler Rough-in/Hydro5/23/20035/23/20035/23/2003PPART
DetailsRick Jackson
sam; Phone #: ###-#### Internet Inspection Request from: Barbara Moore tripped dry system to baggae handling area - trip time 1 minute; tampers and low air didn't report to fire panel; will need to reverify these signals for proper monitoring 5/23/2003 2:21:32 PM
INSP-Sprinkler Rough-in/Hydro5/7/20035/8/20035/8/2003APART
DetailsRick Jackson
hydro test on second floor area A and C; first floor area C; wet and preaction area B 5/8/2003 4:17:14 PM
Override - Parcel Holds  5/7/2003  
INSP-Sprinkler Rough-in/Hydro4/10/20034/11/20034/11/2003PPART
DetailsRick Jackson
SAM ###-#### area A and C on third floor hydro okay 4/11/2003 3:44:29 PM
Override - Parcel Holds  4/10/2003  
INSP-Sprinkler Rough-in/Hydro3/24/20033/25/20033/25/2003APART
DetailsRick Jackson
sam; Phone #: ###-#### Internet Inspection Request from: Annette Moore hydro okay on first floor Area A. 3/25/2003 10:11:08 AM
INSP-Sprinkler Rough-in3/11/20033/11/20033/11/2003PPART
DetailsRick Jackson
sam; Phone #: ###-#### Internet Inspection Request from: Annette Moore tested pump with TVFP and Russ of Nickerson 3/11/2003 4:30:02 PM
INSP-Sprinkler Rough-in/Hydro2/13/20032/14/20032/14/2003PPART
DetailsRick Jackson
sam; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie hydro okay on basement, feed mains and header in basement; preaction for computer room; future main feeds 2/14/2003 3:19:56 PM
Issue permit  2/13/2003 DONE
Sprinkler Plan Check2/11/2003 2/12/2003 PASS
DetailsBill Alexander
Temporary Concourse "A" and "B" risers and water supply connections required for the demolition of the old, and building of the new Terminal Building. (Approximately 18 months).
PLANS/APPL TAKEN TO FRONT DESK  2/12/2003 DONE
DetailsBill Alexander
Telephone call  2/12/2003 DONE
permit ready and fees due
Plan resubmittals received  2/11/2003  
DetailsBill Alexander
INSP-Sprinkler Rough-in2/7/20032/7/20032/7/2003PPART
DetailsRick Jackson
###-#### okay to cover area between rotunda and ticket area; need fireproofing in spots 2/7/2003 2:17:17 PM
INSP-Sprinkler Rough-in/Hydro1/31/20031/31/20031/31/2003PPART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 1/31/2003 at 9:26:33 AM. Contact: ###-####. will need heads in bottom of shaft on first floor' catwalk area okay 1/31/2003 3:12:22 PM
Sprinkler Plan Check1/23/2003 1/29/2003 PASS
DetailsBill Alexander
PLANS/APPL TAKEN TO FRONT DESK  1/29/2003 DONE
DetailsBill Alexander
Telephone call  1/29/2003 DONE
PERMIT READY AND FEES DUE
CHANGE STATUS TO (ISS)  1/29/2003 DONE
ALREADY PD
Plan resubmittals received  1/23/2003 DONE
INSP-Sprinkler Rough-in1/10/20031/10/20031/10/2003AFAIL
DetailsRick Jackson
heads below 22 inches and numerous obstructed in Area A in catwalk area for baggage handling system
INSP-Sprinkler Rough-in/Hydro12/17/200212/17/200212/17/2002PPART
DetailsRick Jackson
SAM; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie antifreeze system and temp walkway areas are completed; hydro okay; tampers tested okay under FIR02-00480 12/18/2002 7:31:30 AM
Telephone call  12/16/2002 DONE
permit ready and fees due
Issue and Print Permit  12/16/2002 DONE
(F) Reprint permit  12/16/2002 DONE
INSP-Sprinkler Rough-in/Hydro12/13/200212/13/200212/13/2002PPART
DetailsRick Jackson
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung hydro on temp walkway and r/i; will relocate heads at new wall as they are overspaced and at new room in temp wlakway 12/13/2002 4:06:19 PM
Plan resubmittals received  12/13/2002 DONE
DetailsBill Alexander
Temporary (outside) Walkway Protection
Sprinkler Plan Check12/13/2002 12/13/2002 PASS
DetailsBill Alexander
Temporary (outside) Walkway Protection
PLANS/APPL TAKEN TO FRONT DESK  12/13/2002 DONE
DetailsBill Alexander
Sprinkler Plan Check11/20/2002 12/10/2002 FAIL
DetailsBill Alexander
Temporary Walkway plans on hold for Dave Miller's response for under walkway protection. Project on hold pending BLD review.
Dave Miller response 11/27/02 - Sprinklers required.
Approval to proceed with review: Sam Rogers, 2:00pm.
Plans denied due to lack of complete scope and fire protection requirements.
Telephone call  12/10/2002 DONE
DetailsBill Alexander
Temporary Walkway denied. Faxed failed review and sent plans to front desk for calling and returning.
INSP-Sprinkler Rough-in/Hydro12/9/200212/9/200212/9/2002PPART
DetailsRick Jackson
###-#### 12/10/2002 10:45:25 AM r/i for temp walkway okay; hydro okay 12/10/2002 2:41:50 PM
Plan resubmittals received  12/4/2002 DONE
DetailsBill Alexander
Sprinkler Plan Check12/4/2002 12/4/2002 PASS
DetailsBill Alexander
Sky light modification of 9 sprinklers for 3rd floor Mezzanine.
INSP-Sprinkler Rough-in/Hydro12/2/200212/3/200212/3/2002APART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 12/02/2002 at 13:21:53. Contact: ###-####. verified resubmittal on the skylight area; okay per plans; will need to verify that heads aren't painted 12/3/2002 11:35:16 AM
Issue permit  11/27/2002  
Telephone call  11/27/2002 DONE
CALLED 11-27-02
Sprinkler Plan Check11/25/2002 11/26/2002 PASS
DetailsBill Alexander
Atrium Skylight fire sprinkler protection modification required due to obstructions. Third Floor FP2.3C.
PLANS/APPL TAKEN TO FRONT DESK  11/26/2002 DONE
DetailsBill Alexander
Atrium skylight modifications.
Plan assigned to (Bill)11/25/2002 11/25/2002 DONE
Plan resubmittals received  11/25/2002 DONE
3rd floor atrium fire sprinkler modifications.
Plan resubmittals received  11/22/2002 DONE
DetailsBill Alexander
Faxed copy of 3rd floor atrium fire sprinkler modifications.
Sprinkler Plan Check11/22/2002 11/22/2002 FAIL
DetailsBill Alexander
Fire sprinkler 3rd floor atrium modifications.
Telephone call  11/22/2002 DONE
Faxed failed review to Greg Johnson 2:45 pm.
Plan resubmittals received  11/20/2002 DONE
DetailsBill Alexander
Revised Temporary (Sky) walkway.
INSP-Sprinkler Rough-in10/11/200210/14/200210/14/2002APART
DetailsRick Jackson
area okay in concourse A for new bathroom 10/14/2002 9:25:27 AM
INSP-Final Inspection10/10/200210/11/200210/11/2002ACANC
DetailsRick Jackson
Scheduled by a contractor via Hello! on 10/10/2002 at 13:11:25. Contact: ###-####. rescheduled for 10/14 10/11/2002 4:46:19 PM
INSP-Sprinkler Rough-in9/26/20029/26/20029/26/2002PFAIL
DetailsRick Jackson
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung control valves on 1st, 2nd and 3rd floors are located above ceiling; first floor area A is located within baggage conveyor area 9/26/2002 4:12:22 PM
INSP-Sprinkler Rough-in/Hydro9/4/20029/5/20029/5/2002AFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 09/04/2002 at 13:28:58. Contact: ###-####. heads obstructed/overspaced in basement mechanical; refer room; janitor room; EQ branch line in south room; add line and head in south room as shown on plans; heads painted in computer room; heads fire proofed in service corridor; temp walk way off concourse okay to cover; combustibles in concealed space by phone area; okay to cover mechanical chase on third floor 9/5/2002 11:05:16 AM
INSP-Sprinkler Rough-in/Hydro7/2/20027/3/20027/3/2002PFAIL
DetailsRick Jackson
SAM ###-#### heads obstructed in basement at west end mechanical; will continue r/i 7/3/2002 3:45:40 PM
INSP-Sprinkler Rough-in/Hydro7/1/20027/2/20027/2/2002ANR
DetailsRick Jackson
SAM ###-#### Sam didn't have the latest approved a job shack; talked to Greg on phone and they will have plans for pm inspection on 7/3/02 7/2/2002 3:52:43 PM
   7/2/2002 DONE
DetailsDarla L Downs
Parcel Tag Notes: OKAY TO SEND OUT INSPECTIONS FOR ALL TRADES ON BLD00-03428. The following note pertains to baggage system installation.
(any questions contact John Menard at ###-####)

(5-20-02) Please override this tag for all activities associated with permit BLD02-01037. CJW Reason for OverRide:
   7/1/2002 DONE
DetailsDarla L Downs
Parcel Tag Notes: OKAY TO SEND OUT INSPECTIONS FOR ALL TRADES ON BLD00-03428. The following note pertains to baggage system installation.
(any questions contact John Menard at ###-####)

(5-20-02) Please override this tag for all activities associated with permit BLD02-01037. CJW Reason for OverRide:
Telephone call  6/27/2002 DONE
permit ready and fees due
Override - Parcel Holds  6/27/2002  
Issue permit  6/27/2002 DONE
Sprinkler Plan Check6/12/2002 6/26/2002 PASS
DetailsBill Alexander
Modified calculations for passenger terminal areas modified to include a 500 gpm hose demand, (not 250gpm), the abandoning of underground below area "B" (installed under building), rezoning to now include a zone #5 for entire Concourse "B". Zone #6 to feed the future Concourse "A". These plans include all changes made, i.e., walls added, preaction protection for computer room, deck changes-basement, floor zone controls, etc.
PLANS/APPL TAKEN TO FRONT DESK  6/26/2002 DONE
DetailsBill Alexander
Telephone call  5/20/2002 DONE
greg ###-####
Override - Parcel Holds  5/20/2002  
Issue permit  5/20/2002 DONE
Plan assigned to (Bill)5/6/2002 5/17/2002 DONE
5/17/2002 14:59:55 JWA - activity updated through activity FIRA22 from case FIR02-00005.
Sprinkler Plan Check5/7/2002 5/17/2002 PASS
DetailsBill Alexander
1.Remaining Zone # 3.
2.New addition.
3.Basement Preaction system (change).
4.Walkways.
PLANS/APPL TAKEN TO FRONT DESK  5/17/2002 DONE
DetailsBill Alexander
PLANS/APPL TAKEN TO FRONT DESK  4/5/2002 DONE
DetailsBill Alexander
Override - Parcel Holds  4/5/2002  
Issue and Print Permit  4/5/2002 DONE
Sprinkler Plan Check3/21/2002 4/4/2002 PASS
DetailsBill Alexander
SUBMITTAL #3 fire sprinkler package.
Issue and Print Permit  2/26/2002 DONE
Sprinkler Plan Check2/14/2002 2/25/2002 PASS
DetailsBill Alexander
Phase 2 resubmittal (1st Floor Zones 2 & 3).
PLANS/APPL TAKEN TO FRONT DESK  2/25/2002 DONE
DetailsBill Alexander
Telephone call  2/25/2002 DONE
LEFT MESSAGE PERMIT READY//AIM
Telephone call  2/12/2002 DONE
talked to greg to verify plans are ready
Issue permit  2/12/2002 DONE
Sprinkler Plan Check2/6/2002 2/11/2002 PART
DetailsBill Alexander
Phase 2 Partial-Proceed. (1st Floor Zones 2 & 3) Plans provide appear to lack full coverage in many areas of soffited ceilings. Need verification of opening protection north and west of room 137 (first floors). Resubmittal required.
Miscellaneous action  2/11/2002 DONE
DetailsBill Alexander
Took partially approved plans to front desk for calling and pickup. OK to proceed, but need approved resubmittals of stamped plans prior to inspection of this phase.
INSP-Sprinkler Rough-in1/14/20021/14/20021/14/2002PPART
DetailsRick Jackson
Added by Inspector: 409 On 1/14/2002 2:14:54 PM checked hangers in basement and retaining straps are installed where fireproofing is going to be applied this week.
Inspection Record Card- Fire1/11/2002 1/11/2002 DONE
Telephone call  1/11/2002 DONE
left mess with greg johnson that permit is ready
Issue permit  1/11/2002 DONE
Plan assigned to (Bill)1/7/2002 1/10/2002 DONE
1/10/2002 14:32:35 JWA - activity updated through activity FIRA22 from case FIR02-00005.
Sprinkler Plan Check1/7/2002 1/10/2002 PASS
DetailsBill Alexander
(Basement Zone 2) Phase 1 submittal
PLANS/APPL TAKEN TO FRONT DESK  1/10/2002 DONE
DetailsBill Alexander
Phase 1 submittal
Application received  1/7/2002