INSP-Final Inspection | 5/21/2002 | 5/22/2002 | 5/22/2002 | A | PASS |
Rick Jackson
|
|
|
Scheduled by Inspector: 409 On 5/21/2002 4:11:45 PM
|
DOC - Permit Finaled | 5/22/2002 | 5/22/2002 | 5/22/2002 | A | PASS |
Rick Jackson
|
|
|
Finaled by inspector at 5/22/2002 9:14:39 AM
|
INSP-Sprinkler Rough-in/Hydro | 5/2/2002 | 5/2/2002 | 5/2/2002 | P | PASS |
Rick Jackson
|
|
|
Added by Inspector: 409 On 5/2/2002 12:16:36 PM hydro on overhead and underground okay; need to test alarms
|
INSP-Supply line flush | 5/1/2002 | 5/1/2002 | 5/1/2002 | P | PASS |
Troy Cobbley
|
|
|
underground flush OK
|
INSP-Sprinkler Rough-in | 4/24/2002 | 4/24/2002 | 4/24/2002 | A | PART |
Rick Jackson
|
|
|
Added by Inspector: 409 On 4/24/2002 9:02:45 AM one strap by pharmacy; anti freeze loop not complete
|
Issue permit | | | 3/5/2002 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 3/4/2002 | | 3/4/2002 | | DONE |
|
|
|
|
Telephone call | | | 3/4/2002 | | DONE |
|
|
|
###-####
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/4/2002 | | DONE |
Bill Alexander
|
|
|
|
Plan assigned to (Bill) | 2/20/2002 | | 3/4/2002 | | DONE |
|
|
|
3/4/2002 14:44:21 JWA - activity updated through activity FIRA22 from case FIR02-00060.
|
Sprinkler Plan Check | 3/1/2002 | | 3/4/2002 | | PART |
Bill Alexander
|
|
|
Requires resubmittal on earthquake calcs and outside control valve (required).
|
Sprinkler Plan Check | 2/20/2002 | | 2/28/2002 | | FAIL |
Bill Alexander
|
|
|
Sprinkler applications are not correct. Heads using are not OR and thus not listed for reduced area allowance for lower ceiling heights. Drive-Thru is not Light Hazard Occupancy, but OH-1.
|
Miscellaneous action | | | 2/28/2002 | | DONE |
|
|
|
Took failed package to front desk for calling and returning to Debest Fire.
|
Application received | | | 2/20/2002 | | |
|
|
|
|
Case Summary | | | | | DONE |
|
|
|
|