Permit Information
Permit NumberFIR02-00061
StatusFinaled
Name COMMERCIAL FIRE PROTECTION
Site Address 303 N ALLUMBAUGH ST
Project NameSPR INTERMOUNTAIN HOSPITAL
Customer Number 
ePlanReview 
Description
To install a complete NFPA 13-1999, wet pipe, light hazard system in a new 11,250 ft/2 Health Care Treatment facility consisting of wood constructed walls, floor, (what appears to be a) non gable-flat roof joist system. Cavities appear to protected with 3/4" gyp board sheeting, enabling a non-combustible space. Wiring installed in this cavity, must be plenum rated. The fire sprinkler system shall comply with NFPA 13-1999, red-lined plans, attached review comment and conditions list, as regulated by the Fire Chief. A fire "Inspection Card" is required as a condition of this permit, to provide witness of compliance with the same. This permit is not attached to any building permit (at this date).
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Plan resubmittals received  11/21/2002 DONE
Bill A.
INSP-Sprinkler Rough-in/Hydro8/9/20028/12/20028/12/2002APASS
DetailsTroy Cobbley
hydro test for the overhead system is OK. Permit also finaled 8/12/2002 4:42:47 PM
DOC - Permit Finaled8/12/20028/12/20028/12/2002PPASS
DetailsTroy Cobbley
Finaled by inspector at 8/12/2002 4:42:52 PM
INSP-Sprinkler Rough-in/Hydro8/8/20028/9/20028/9/2002AFAIL
DetailsTroy Cobbley
above ground hydro test failed 8/9/2002 2:11:09 PM
INSP-Supply line flush8/8/20028/8/20028/8/2002PPASS
DetailsTroy Cobbley
flush OK
INSP-Sprinkler Rough-in7/17/20027/17/20027/17/2002APASS
DetailsTroy Cobbley
Underground thrust block ok for cover
INSP-Sprinkler Rough-in/Hydro7/11/20027/11/20027/11/2002APASS
DetailsTroy Cobbley
Underground supply OK to cover
INSP-Supply line flush7/11/20027/11/20027/11/2002PCANC
DetailsTroy Cobbley
duplicate inspection 7/11/2002 3:24:25 PM
INSP-Supply line flush6/27/20026/28/20026/28/2002AFAIL
DetailsTroy Cobbley
Inspection was for the stub out only. The thrust blocking and beding is OK but the nuts and bolts need the non corrosive covering. Contractor said it would be taken care of monday 6/28/2002 2:56:37 PM
INSP-Sprinkler Rough-in/Hydro6/27/20026/28/20026/27/2002ACANC
DetailsTroy Cobbley
Scheduled by a contractor via Hello! on 06/27/2002 at 13:26:24. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 06/27/2002 at 13:27:22.
INSP-Sprinkler Rough-in5/13/20025/14/20025/14/2002PPART
DetailsRick Jackson
r/i- ###-####- bruce Modules A-B-C okay; plans kept in Tom's office; all areas above finsihed ceiling are sheetrocked 5/14/2002 4:03:04 PM
Issue and Print Permit  5/13/2002 DONE
Plan assigned to (Bill)2/21/2002 3/11/2002 DONE
3/11/2002 15:08:11 JWA - activity updated through activity FIRA22 from case FIR02-00061.
Sprinkler Plan Check3/7/2002 3/11/2002 PASS
DetailsBill Alexander
PLANS/APPL TAKEN TO FRONT DESK  3/11/2002 DONE
DetailsBill Alexander
Inspection Record Card- Fire3/11/2002 3/11/2002 DONE
Telephone call  3/11/2002 DONE
SPOKE WITH JOHN WARNICK PERMIT READY
Miscellaneous action  3/1/2002 DONE
Packages taken to front desk for calling and returning.
Application received  2/21/2002  
Sprinkler Plan Check2/21/2002   FAIL
DetailsBill Alexander
Requires forward flow test piping, PVC exposed, Hydrant exceeds limit to FDC, Water supply certificate taken off wrong address, etc.
Case Summary    DONE