Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberFIR02-00130
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 8000 S FEDERAL WAY
Project NameSPR MICRON MASK SHOP
Customer Number 
ePlanReview 
Description
MICRON MASK SHOP TENANT IMPROVEMENT (PCS #80-20003278) * TO INSTALL 5 COMPLETE WET FIRE SPRINKLER SYSTEMS IN AN 80,350 FT/2, TWO STORY STRUCTURE WITH 26,870 FT/2 BASEMENT, MICRON MASK SHOP, FOR FABRICATION AND OFFICE OCCUPANCY. THIS BUILDING WILL CONTAIN A 13,725 FT/2 OFFICE AREA AND THE REMAINDER OF TWO STORIES AND BASEMENT WILL BE FABRICATION AND STORAGE AREAS. THE BASEMENT AREAS ARE PRIMARILY NORMALLY UNOCCUPIED CHEMICAL STORAGE, SUPPLY AND RECOVERY AREAS. THE SECOND FLOOR IS PRIMARILY NORMALLY UNOCCUPIED MECHANICAL AND FAN DECK AREAS. THIS FACILITY IS FULLY SPRINKLERED. THE FIRE SPRINKLER SYSTEM SHALL COMPLY WITH THE UFC-1997, NFPA 13-1999, 318-2000, RED-LINED PLANS, ATTACHED REVIEW COMMENT AND CONDITIONS LIST; AS REGULATED BY THE FIRE CHIEF. AN APPROVED AND STAMPED PLAN, PERMIT AND FIRE "INSPECTION CARD" IS REQUIRED ON SITE AS A CONDITION OF THIS PERMIT; TO PROVIDE WITNESS OF COMPLIANCE TO THIS WORK. UNDERGROUND FIRE SERVICE SUPPLY WAS PERMITTED UNDER: FIR02-00098. THE SHELL BUILDING WAS CONSTRUCTED UNDER PERMIT BLD01-02222. THIS FIRE SPRINKLER PERMIT IS ATTACHED TO TENANT IMPROVEMENT BUILDING PERMIT: BLD01-02848.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection10/14/200210/14/200210/14/2002PPASS
DetailsRick Jackson
DOC - Permit Finaled10/14/200210/14/200210/14/2002APASS
DetailsRick Jackson
Finaled by inspector at 10/14/2002 10:23:07 AM
INSP-Final Inspection10/4/200210/7/200210/7/2002APART
DetailsRick Jackson
to mainly review cleanroom walls and protection under ducts. Jonathon Lee foreman on site; Phone #: ###-#### Internet Inspection Request from: Trent Bice okay per plans; need info on work in corridor used for tool wipe down area; EQ on main riser to wall 10/7/2002 3:04:05 PM
INSP-Final Inspection10/4/200210/4/200210/4/2002ACANC
DetailsRick Jackson
Jonathon lee foreman on site. Clean room and fan attic.; Phone #: ###-#### Internet Inspection Request from: Trent Bice Inspection cancelled from web by: Trent Bice
INSP-Sprinkler Rough-in/Hydro7/3/20027/8/20027/8/2002PCANC
DetailsRick Jackson
Scheduled by a contractor via Hello! on 07/03/2002 at 14:10:20. Contact: ###-####.cancel per chris
INSP-Sprinkler Rough-in/Hydro7/8/20027/8/20027/8/2002PPART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 07/08/2002 at 10:04:03. Contact: ###-####. all systems hydro okay 7/8/2002 4:51:04 PM
INSP-Sprinkler Rough-in/Hydro6/26/20026/27/20026/27/2002PPART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 06/26/2002 at 15:38:54. Contact: ###-####. all deficiencies corrected; awaiting heads for drops to hydro all systems and test alarms 6/27/2002 5:00:18 PM
INSP-Sprinkler Rough-in/Hydro6/26/20026/26/20026/26/2002PPART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 06/26/2002 at 10:04:09. Contact: ###-####. all items corrected from previous inspections; need to sprinkler above corridor in sub fab area 6/27/2002 7:00:48 AM
Issue and Print Permit  6/26/2002 DONE
INSP-Sprinkler Rough-in/Hydro6/24/20026/25/20026/25/2002PFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 06/24/2002 at 14:54:55. Contact: ###-####. eq on main feed and FDC; need walls at AHU in basement 6/25/2002 4:33:54 PM
Sprinkler Plan Check6/20/2002 6/25/2002 PASS
DetailsBill Alexander
Field changes and with calculations.
PLANS/APPL TAKEN TO FRONT DESK  6/25/2002 PASS
DetailsBill Alexander
Field changes and revised calculations.
INSP-Sprinkler Rough-in/Hydro6/24/20026/24/20026/24/2002PFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 06/24/2002 at 08:09:43. Contact: ###-####. straps; hangers and several obstructions 6/25/2002 7:06:36 AM
INSP-Sprinkler Rough-in/Hydro6/19/20026/21/20026/21/2002ACANC
DetailsRick Jackson
Scheduled by a contractor via Hello! on 06/19/2002 at 16:33:59. Contact: ###-####. I ran out of time today; will reschedule for 6/24 6/21/2002 4:02:38 PM
INSP-Sprinkler Rough-in/Hydro6/18/20026/19/20026/19/2002PFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 06/18/2002 at 16:33:28. Contact: ###-####. hangers in office area; clean has modifications to plans - need to resubmit with clacs for review and approval; will continue inspection on 6/20 6/19/2002 4:02:29 PM
INSP-Sprinkler Rough-in/Hydro6/17/20026/18/20026/18/2002PPART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 06/17/2002 at 16:56:27. Contact: ###-####. met with Mike; will need resubmittals for clean room 6/18/2002 4:52:27 PM
INSP-Sprinkler Rough-in/Hydro6/13/20026/14/20026/14/2002PPART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 06/13/2002 at 08:18:42. Contact: ###-####. received call from Mike of Shilo and he said he wouldn't be there and he would reschedule for next week; went to job trailer and reviewed plans; left c/n with Les about having provisions to test flow switches in gas rooms 6/14/2002 3:49:18 PM
Inspection Record Card- Fire6/11/2002 6/11/2002 DONE
Telephone call  6/11/2002 DONE
###-####
Issue permit  6/11/2002 DONE
PLANS/APPL TAKEN TO FRONT DESK  6/10/2002 DONE
DetailsBill Alexander
Sprinkler Plan Check6/7/2002 6/10/2002 PASS
DetailsBill Alexander
Received sprinkler head analysis reports and incorproating them in City Plans only.
Telephone call  6/3/2002 DONE
DetailsBill Alexander
Recieved phone call from Bob Knight, Shilo questioning my request for more information. Made comment that Boise requires information surpassing anywhere else.

My response was basically - provide the information requested.
He said he would comply.
Sprinkler Plan Check6/1/2002 6/3/2002 PART
DetailsBill Alexander
Modified water supply information-revised calculations throughout all areas verified.

Remote calculations densities do not match design cover sheets with remote test #1, deficient with 3 heads. Others are questioned since the calculations provided are difficult to interpret due to lack of final head analysis (number/identified heads operating, elevation of heads operating, specified head k-factor, minimum operating pressures/flows each).
Faxed letter.
Telephone call  5/15/2002 DONE
left mess that permit is ready
Issue permit  5/15/2002 DONE
PLANS/APPL TAKEN TO FRONT DESK  5/14/2002 DONE
DetailsBill Alexander
Plan assigned to (Bill)4/5/2002 5/14/2002 DONE
5/14/2002 08:45:22 JWA - activity updated through activity FIRA22 from case FIR02-00130.
Sprinkler Plan Check4/29/2002 5/14/2002 PART
DetailsBill Alexander
05/09/2002 - Received modified plans that are legible.
05/14/2002 - Approved to proceed, but requires resubmittal of items (reference review notes). Double fees apply for working without a permit.
Meeting  5/8/2002 DONE
DetailsBill Alexander
Micron (Paul Marciolina) GC-Representative and Shilo (Bob Knight and field superintendant) requested meeting to see what the dificulty was concerning plans.

Plans were designed by an outside firm and Shilo indicated they followed the same design under Microns instructions. Shilo indicated that they were told these plans were previously reviewed and approved by me (per Jerry O'Neil)? Micron denied this after a phone call verifying comments made by Shilo. Micron disagreed and said Shilo was not.

I asked for plans that I can read building lines for romm identification boundaries, etc.

Shilo and Micron wanted permission to start prior to appoved plans. I reiterated that a signed letter of compliance would be accepted (with consent to comply with any code violations at there own expense). They aggreed.

Meeting basically dismissed.
Sprinkler Plan Check4/5/2002 4/19/2002 FAIL
DetailsBill Alexander
Basement problems with calculations (area/density) and head spacing on the plans. Some areas (appear) to lack protection. Plans do not provide more detail/information. Need to get anf provide "the basics" prior to further reviewing of plans.
Telephone call  4/19/2002 DONE
12:00 PM: called Shawn Fenneran and asked for a meeting to go over the plans. He siad he could not today, but would send a "Runner". I interated that once he got the plans, call (me) and we shall review my denial and requests. (The "basic" code issue of design with area/density requirements)
Application received  4/5/2002  
Case Summary    DONE
Case Summary    DONE
Case Summary    DONE