INSP-Final Inspection | 8/29/2002 | 8/29/2002 | 8/29/2002 | P | PASS |
Rick Jackson
|
|
|
|
DOC - Permit Finaled | 8/29/2002 | 8/29/2002 | 8/29/2002 | P | PASS |
Rick Jackson
|
|
|
Finaled by inspector at 8/29/2002 3:47:34 PM
|
INSP-Sprinkler Rough-in/Hydro | 8/14/2002 | 8/14/2002 | 8/14/2002 | P | PASS |
Rick Jackson
|
|
|
hydro on UG and overhead okay
|
Inspection Record Card- Fire | 5/6/2002 | | 5/6/2002 | | DONE |
|
|
|
|
Telephone call | | | 5/6/2002 | | DONE |
|
|
|
CALLED DON PERMIT READY 5-6-02
|
Issue and Print Permit | | | 5/6/2002 | | DONE |
|
|
|
|
Sprinkler Plan Check | 4/25/2002 | | 5/3/2002 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/3/2002 | | DONE |
Bill Alexander
|
|
|
|
Plan assigned to (Bill) | 4/5/2002 | | 5/3/2002 | | DONE |
|
|
|
5/3/2002 16:21:56 JWA - activity updated through activity FIRA22 from case FIR02-00154.
|
Sprinkler Plan Check | 4/5/2002 | | 4/18/2002 | | FAIL |
Bill Alexander
|
|
|
Lacking all elevation pressure loss in the attic sprinkler protection calculations. Lack proper coverage due to missing draft stops, skylight/soffits in the attic and incorrect use of attic head. Questions on shower stall. Questioned coverage on opening from ground floor to 3rd floor roof next to inside stairs. Need to calculate the most demanding single head demand on the 3rd floor.
|
Meeting | | | 4/18/2002 | | DONE |
|
|
|
Met with Don Weland and Bob Knight on this project and discussed items listed in the failed activity review. 9:30 AM.
|
Telephone call | | | 4/17/2002 | | DONE |
|
|
|
Called Don Weland (Shilo-Designer) and illustrated problems with attic system and had enough to deny plans. Continuing with wet system.
|
Application received | | | 4/5/2002 | | |
|
|
|
|
Case Summary | | | | | DONE |
|
|
|
|