(F) Reprint permit | | | 5/21/2003 | | |
|
|
|
|
INSP-Final Inspection | 7/3/2002 | 7/3/2002 | 7/3/2002 | A | PASS |
Troy Cobbley
|
|
|
Fire sprinkler system finaled
|
DOC - Permit Finaled | 7/3/2002 | 7/3/2002 | 7/3/2002 | A | PASS |
Troy Cobbley
|
|
|
Finaled by inspector at 7/3/2002 10:35:00 AM
|
INSP-Final Inspection | 4/30/2002 | 5/1/2002 | 5/1/2002 | P | PART |
Troy Cobbley
|
|
|
sprinkler rough-in ok. waiting for alarm connection for final 5/1/2002 4:09:25 PM
|
INSP-Sprinkler Rough-in/Hydro | 4/26/2002 | 4/29/2002 | 4/29/2002 | A | CANC |
Troy Cobbley
|
|
|
Scheduled by a contractor via Hello! on 04/26/2002 at 16:48:42. Contact: ###-####.
|
Inspection Record Card- Fire | 4/29/2002 | | 4/29/2002 | | DONE |
|
|
|
|
Telephone call | | | 4/26/2002 | | DONE |
|
|
|
CALLED SHAWN PLANS READY 4-26-02 ///DLD
|
Issue permit | | | 4/26/2002 | | DONE |
|
|
|
|
Sprinkler Plan Check | 4/18/2002 | | 4/25/2002 | | FAIL |
Bill Alexander
|
|
|
Plans lack any node references for calculations verifications.
|
Telephone call | | | 4/25/2002 | | DONE |
Bill Alexander
|
|
|
Called S. Fenneran (Shilo-Designer) and told him the problem that no caclulations nodes were put on the plans. Said he would send down copies in the AM.
|
Miscellaneous action | | | 4/25/2002 | | DONE |
Bill Alexander
|
|
|
Contractor has started work prior to permitting/approval. (Added another review for the penalty which matches the double fee).
|
Application received | | | 4/18/2002 | | |
|
|
|
|
Plan assigned to (Bill) | 4/18/2002 | | | | |
|
|
|
|
Case Summary | | | | | |
|
|
|
|
Case Summary | | | | | |
|
|
|
|