INSP-Final Inspection | 5/17/2002 | 5/17/2002 | 5/17/2002 | P | PASS |
Troy Cobbley
|
|
|
Fire sprinkler system finaled
|
DOC - Permit Finaled | 5/17/2002 | 5/17/2002 | 5/17/2002 | P | PASS |
Troy Cobbley
|
|
|
Finaled by inspector at 5/17/2002 12:11:11 PM
|
INSP-Sprinkler Rough-in/Hydro | 5/7/2002 | 5/7/2002 | 5/7/2002 | P | PART |
Rick Jackson
|
|
|
###-#### BRYAN okat to cover; hydro okay also; one head by east hall coated with texture; wrong heads installed in rear storage area but have same K factor; alarms not complete 5/7/2002 3:45:31 PM
|
Override - Parcel Holds | | | 5/7/2002 | | |
|
|
|
|
Override - Parcel Holds | | | 5/6/2002 | | |
|
|
|
|
Issue permit | | | 5/6/2002 | | DONE |
|
|
|
|
Telephone call | | | 5/3/2002 | | DONE |
|
|
|
LEFT MESS FOR BRIAN THAT PERMIT IS READY
|
Plan assigned to (Bill) | 4/22/2002 | | 5/3/2002 | | DONE |
|
|
|
5/3/2002 15:05:50 JWA - activity updated through activity FIRA22 from case FIR02-00163.
|
Sprinkler Plan Check | 4/30/2002 | | 5/3/2002 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/3/2002 | | DONE |
Bill Alexander
|
|
|
|
Sprinkler Plan Check | 4/22/2002 | | 4/26/2002 | | FAIL |
Bill Alexander
|
|
|
1. Riser is being modified which will require backflow prevention per (Local Purveyors). 2. This will require recalcuations (with reqauired nodes matching plans).
3. Need a permit application with submittals.
4. Submit sprinkler head data submittals with each package.
|
Miscellaneous action | | | 4/26/2002 | | DONE |
|
|
|
Took plans to front desk for calling and return.
|
Telephone call | | | 4/26/2002 | | DONE |
|
|
|
Faxed copy of review to contractor.
|
Application received | | | 4/22/2002 | | |
|
|
|
|
Case Summary | | | | | DONE |
|
|
|
|
Inspection Record Card- Fire | 5/3/2002 | | | | |
|
|
|
|