INSP-Final Inspection | 10/24/2002 | 10/24/2002 | 10/24/2002 | P | PASS |
Troy Cobbley
|
|
|
fire finaled
|
DOC - Permit Finaled | 10/24/2002 | 10/24/2002 | 10/24/2002 | P | PASS |
Troy Cobbley
|
|
|
Finaled by inspector at 10/24/2002 2:44:30 PM
|
INSP-Sprinkler Rough-in/Hydro | 10/16/2002 | 10/17/2002 | 10/17/2002 | A | CANC |
Troy Cobbley
|
|
|
inspection was for the above ground hydro test and has been passed under FIR02-00304 10/17/2002 10:50:30 AM
|
INSP-Sprinkler Rough-in/Hydro | 10/16/2002 | 10/16/2002 | 10/16/2002 | P | CANC |
Troy Cobbley
|
|
|
inspection was for the overhead rough-in and the entry was made under FIR02-00304 10/16/2002 4:00:14 PM
|
INSP-Supply line flush | 8/29/2002 | 8/30/2002 | 8/30/2002 | A | PASS |
Troy Cobbley
|
|
|
underground supply line flush and hydro test OK 8/30/2002 10:40:36 AM
|
INSP-Sprinkler Rough-in/Hydro | 5/15/2002 | 5/15/2002 | 5/15/2002 | A | PART |
Rick Jackson
|
|
|
Scheduled by Inspector: 409 On 5/15/2002 8:23:29 AM underground only - okay to cover; PIV installed as shown on plans 5/15/2002 10:25:01 AM
|
INSP-Sprinkler Rough-in/Hydro | 5/10/2002 | 5/13/2002 | 5/13/2002 | A | FAIL |
Troy Cobbley
|
|
|
Post indicator valve location needs to be verified, fittings need to be coated 5/13/2002 10:44:17 AM
|
CHANGE STATUS TO (ISS) | | | 5/10/2002 | | DONE |
|
|
|
not sure whats going on the customer has paid the fee and has all the cards.....rad
|
Telephone call | | | 4/26/2002 | | DONE |
|
|
|
called left v-message for ross plans ready 4-26-02
|
Plan assigned to (Bill) | 4/23/2002 | | 4/25/2002 | | DONE |
Bill Alexander
|
|
|
4/25/2002 15:32:19 JWA - activity updated through activity FIRA22 from case FIR02-00178.
|
Sprinkler Plan Check | 4/23/2002 | | 4/25/2002 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/25/2002 | | DONE |
Bill Alexander
|
|
|
|
Application received | | | 4/23/2002 | | |
|
|
|
|
Case Summary | | | | | DONE |
|
|
|
|
Inspection Record Card- Fire | 4/26/2002 | | | | |
|
|
|
|