DOC - Permit Finaled | 7/26/2002 | 7/26/2002 | 7/26/2002 | P | PASS |
Rick Jackson
|
|
|
Finaled by inspector at 7/26/2002 12:22:22 PM
|
INSP-Final Inspection | 7/26/2002 | 7/26/2002 | 7/26/2002 | P | PASS |
Rick Jackson
|
|
|
|
INSP-Sprinkler Rough-in/Hydro | 7/2/2002 | 7/2/2002 | 7/2/2002 | P | PART |
Rick Jackson
|
|
|
Scheduled by Inspector: 409 On 7/2/2002 12:44:50 PM hydro completed; need bell; tape off heads; anti freeze solution; test alarms 7/2/2002 2:27:54 PM
|
Sprinkler Plan Check | 5/14/2002 | | 5/15/2002 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/15/2002 | | DONE |
Bill Alexander
|
|
|
|
Plan assigned to (Bill) | 5/1/2002 | | 5/15/2002 | | DONE |
|
|
|
5/15/2002 08:02:19 JWA - activity updated through activity FIRA22 from case FIR02-00185.
|
Telephone call | | | 5/15/2002 | | DONE |
|
|
|
left mess that permit is ready
|
Issue permit | | | 5/15/2002 | | DONE |
|
|
|
|
Sprinkler Plan Check | 5/1/2002 | | 5/14/2002 | | FAIL |
Bill Alexander
|
|
|
Lack correct maximum coverage (exceed 130 ft/2). RP backflow input was 2.5 lbs short in calculations. Remote test was not verified for 130 for friction loss spacing. Appears to have many obstructions with HVAC units which need clarified. Exterior control appear to not be impossible to install with this facility.
|
Application received | | | 5/1/2002 | | |
|
|
|
|
Case Summary | | | | | DONE |
|
|
|
|
Inspection Record Card- Fire | 5/15/2002 | | | | |
|
|
|
|