Case Summary | | | 7/26/2004 | | DONE |
|
|
|
|
INSP-Final Inspection | 5/22/2003 | 5/22/2003 | 5/22/2003 | A | PASS |
Rick Jackson
|
|
|
|
DOC - Permit Finaled | 5/22/2003 | 5/22/2003 | 5/22/2003 | A | PASS |
Rick Jackson
|
|
|
|
INSP-Final Inspection | 5/20/2003 | 5/21/2003 | 5/21/2003 | A | FAIL |
Rick Jackson
|
|
|
this is grants cell. If we can do this at 8.00AM. Thank you Terry; Phone #: ###-#### Internet Inspection Request from: Terry Owsley need maps of initiating devices and Record of Completion; strobes synch'd 5/21/2003 7:49:40 AM
|
INSP-Final Inspection | 5/9/2003 | 5/13/2003 | 5/13/2003 | A | FAIL |
Rick Jackson
|
|
|
This is Grants cell. This needs to be done at 7:00 am. Have a great day.; Phone #: ###-#### Internet Inspection Request from: Terry Owsley not synchronized; maps with initiating devices; need better descriptors at FACP 5/13/2003 8:41:27 AM
|
INSP-Final Inspection | 5/5/2003 | 5/9/2003 | 5/8/2003 | A | CANC |
Rick Jackson
|
|
|
This is Grants Cell. Needs to be tested at 7:00 am if thats OK
Have a great day.; Phone #: ###-#### Internet Inspection Request from: Terry Owsley called Rob of Protex and told him I would not be able to do this inspection on 5/09 and he said he would reschedule for next week 5/8/2003 1:10:59 PM
|
INSP-Final Inspection | 4/24/2003 | 4/28/2003 | 4/28/2003 | A | NR |
Rick Jackson
|
|
|
This is grants Cell.
Thank you ; Phone #: ###-#### Internet Inspection Request from: Terry Owsley talked to Grant and they will reschedule when ready 4/28/2003 1:47:17 PM
|
INSP-Final Inspection | 4/22/2003 | 4/25/2003 | 4/24/2003 | A | CANC |
Rick Jackson
|
|
|
This is Grants Cell
Thanks Terry; Phone #: ###-#### Internet Inspection Request from: Terry Owsley Inspection cancelled from web by: Terry Owsley
|
INSP-Final Inspection | 2/21/2003 | 2/24/2003 | 2/24/2003 | A | NR |
Rick Jackson
|
|
|
Grant Ahten; Phone #: ###-#### Internet Inspection Request from: Terry Owsley per phone call from Rob this inspection won't be ready as they have determined that sprinkler control valves aren't supervised by the alarm panel; he will call when ready 2/24/2003 1:23:52 PM
|
INSP-Final Inspection | 2/7/2003 | 2/12/2003 | 2/12/2003 | A | FAIL |
Rick Jackson
|
|
|
Phone #: ###-#### Internet Inspection Request from: Terry Owsley inspection stopped due to: horns not working on all floors; strobes not in sync; south area of first floor devices not being recognized. Also need device location maps at FACP. Will need to test all devices, notification circuits; troubles; elevator recall; pump supervision - start test from scratch 2/12/2003 8:52:48 AM
|
FIR-Aging Inspection | 1/28/2003 | 1/28/2003 | 1/28/2003 | | NR |
Troy Cobbley
|
|
|
I spoke with Grant, who is with Protex and he stated that they were waiting for the elevators to get signed off before they called for inspection on the fire alarm system. He stated that the inspection would probably be called in next week 1/28/2003 9:40:20 AM
|
Issue and Print Permit | | | 10/29/2002 | | DONE |
|
|
|
|
Alarm Plan Check | 10/23/2002 | | 10/25/2002 | | PASS |
|
|
|
Approved with conditions based on resubmittal revisions completed 10/25/02 by Protex and Farren.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/25/2002 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 10/25/2002 | | 10/25/2002 | | DONE |
|
|
|
|
Telephone call | | | 10/25/2002 | | DONE |
|
|
|
permit ready and fees due
|
Alarm Plan Check | 10/7/2002 | | 10/18/2002 | | HOLD |
|
|
|
10/7/02 resubmittal package not acceptable. HOLD- for Protex to come in on Monday to properly assemble the resubmittal into complete sets, identify changes, and address all items on the previous review.
|
Alarm Plan Check | 9/10/2002 | | 9/20/2002 | | FAIL |
|
|
|
9/10/02-REsubmittal-CONDITIONAL approval given to install subject to receipt and approval of resubmittal before final inspection and test can be conducted. Written review comments discussed with Rob at Protex and faxed to Protex and designer, Farren Engr'g.
|
Plan assigned to (SAM) | 9/9/2002 | | 9/9/2002 | | DONE |
|
|
|
REMOVED READY STATUS WHITCH WAS DONE IN ERROR.
|
Meeting | | | 6/25/2002 | | DONE |
|
|
|
Meting held at Library with John Farrin( Farrin Engineering), Rob Ahten (protex) to review questions on-site. Reviewed all comments from my initial review. I agreed to use of ceiling mounted area SD's directly above the wall-mounted air conditioning units for smoke detection/fan shut down. They will revise plans and resubmit per our discussion and all other agreements.
|
Plan assigned to (SAM) | 6/5/2002 | | 6/19/2002 | | DONE |
|
|
|
6/19/2002 10:13:42 SLR - activity updated through activity FIRA22 from case FIR02-00228.
|
Alarm Plan Check | | | 6/19/2002 | | FAIL |
|
|
|
Numerous issues with plan review; agreed with Protex and Farren engineering to have a meeting to discuss the issues rather than the time consuming effort to write up a complete review. Meeting scheduled with Farren Engr. for 6/25, 9:00 AM at City Hall.
|
Application received | | | 6/5/2002 | | |
|
|
|
|