INSP-Final Inspection | 3/3/2003 | 3/4/2003 | 3/4/2003 | P | PASS |
Rick Jackson
|
|
|
1:30 per Brian with Viking
|
INSP-Final Inspection | 3/4/2003 | 3/4/2003 | 3/4/2003 | P | PASS |
Rick Jackson
|
|
|
|
DOC - Permit Finaled | 3/4/2003 | 3/4/2003 | 3/4/2003 | P | PASS |
Rick Jackson
|
|
|
Finaled by inspector at 3/4/2003 1:52:57 PM
|
INSP-Final Inspection | 2/28/2003 | 3/3/2003 | 3/3/2003 | P | NR |
Rick Jackson
|
|
|
1:30 rescheduled for 3/4/03 per Brian with Viking 3/3/2003 3:32:51 PM
|
INSP-Final Inspection | 2/25/2003 | 2/28/2003 | 2/28/2003 | P | FAIL |
Rick Jackson
|
|
|
rick; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie low/high air not working 2/28/2003 2:54:39 PM
|
INSP-Sprinkler Rough-in | 12/2/2002 | 12/9/2002 | 12/9/2002 | P | PART |
Rick Jackson
|
|
|
overhead inspection ###-#### overhead hydro okay; will need heat in new space; flush and hydro underground; need alarm plans; need tampered ball valve for alarm switch 12/10/2002 10:43:36 AM
|
INSP-Sprinkler Rough-in | 12/2/2002 | 12/6/2002 | 12/6/2002 | P | FAIL |
Rick Jackson
|
|
|
underground inspection ###-#### still didn't have approved plans; notified Linda Hartwell to add re-inspection fee 12/10/2002 10:33:35 AM
|
INSP-Supply line flush | 8/7/2002 | 8/8/2002 | 8/8/2002 | P | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 08/07/2002 at 13:36:25. Contact: ###-####. stub out from footing okay; used rods at base and first 90 8/8/2002 4:22:19 PM
|
Issue permit | | | 7/25/2002 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 6/18/2002 | | 7/15/2002 | | DONE |
|
|
|
7/15/2002 11:54:06 JWA - activity updated through activity FIRA22 from case FIR02-00246.
|
Sprinkler Plan Check | 7/12/2002 | | 7/15/2002 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/15/2002 | | DONE |
Bill Alexander
|
|
|
|
Inspection Record Card- Fire | 7/15/2002 | | 7/15/2002 | | DONE |
|
|
|
|
Telephone call | | | 7/10/2002 | | DONE |
|
|
|
left message plans denied need to pick up
|
Sprinkler Plan Check | 7/9/2002 | | 7/9/2002 | | FAIL |
Bill Alexander
|
|
|
Water supply is provided on another street. Ignored required hydraulic graph. Thrust block shown is in distrubed earth of which will have +18,000 lbs of thrust when testing.
|
Sprinkler Plan Check | 6/19/2002 | | 6/25/2002 | | FAIL |
Bill Alexander
|
|
|
Calculations do not match hazard/spacing/pressures/flows. Requires backflow forward test connection. Need head submittal, Hydraulic graph sheet, backflow preventer manufacturer/model for calculation pressure loss info, detailed tie-in underground work (including materials, etc.). Need dry system capacity and air compressor info. Stopped review. Sending package back for designer to reverify project, review notes and resubmit.
|
Miscellaneous action | | | 6/25/2002 | | DONE |
|
|
|
Took failed pachage to front desk for calling and return - 11:15 am.
|
Application received | | | 6/18/2002 | | |
|
|
|
|
Case Summary | | | | | DONE |
|
|
|
|