Case Summary | | | 12/12/2008 | | |
|
|
|
|
Case Summary | | | 7/27/2004 | | DONE |
|
|
|
|
INSP-Final Inspection | 2/25/2003 | 2/28/2003 | 2/28/2003 | P | PASS |
Rick Jackson
|
|
|
3:00
|
DOC - Permit Finaled | 2/28/2003 | 2/28/2003 | 2/28/2003 | P | PASS |
Rick Jackson
|
|
|
Finaled by inspector at 2/28/2003 4:11:12 PM
|
INSP-Final Inspection | 2/21/2003 | 2/25/2003 | 2/25/2003 | P | CANC |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 2/21/2003 at 2:47:18 PM. Contact: ###-####. rescheduled for 2/28 at 3 pm 2/25/2003 12:22:05 PM
|
Issue permit | | | 2/21/2003 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 2/20/2003 | | 2/20/2003 | | DONE |
|
|
|
|
Telephone call | | | 2/20/2003 | | DONE |
|
|
|
permit ready and fees due
|
Plan resubmittals received | | | 2/20/2003 | | DONE |
|
|
|
|
Alarm Plan Check | | | 2/19/2003 | | PASS |
|
|
|
plan modification submitted 2/14/03, approved subject to satisfacotyr field inspection. No written review comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/19/2003 | | DONE |
|
|
|
approved plan revision -Resubmittal fee applies
|
Plan resubmittals received | | | 2/14/2003 | | DONE |
|
|
|
|
INSP-Final Inspection | 2/6/2003 | 2/7/2003 | 2/7/2003 | P | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 2/6/2003 at 11:50:07 AM. Contact: ###-####. tested duct detectors and all worked properly; need the following - new plans submitted for changes; map at remote annunciator with instructions; labels on rooftop cans indicating detectors inside cans; test panel for troubles etc; test sprinkler controls/flows; check NAC panels 2/7/2003 5:10:38 PM
|
INSP-Final Inspection | 1/23/2003 | 1/24/2003 | 1/24/2003 | P | FAIL |
Troy Cobbley
|
|
|
all spot smoke detectors and pull stations have been tested. The zone labeling for the smokes and the pull stations that are shown on the plans is incorrect and needs to be shown correctly on the as-built plans. No duct smoke detectors have been tested. One of the duct detectors in the south end of the building is installed correctly. All audio/visual devices were tested and functioned correctly. Smokes, pulls and A/V's are installed in the correct locations. No other devices have been tested including the NAC panels, FACP panel or fire sprinkler system devices. Review notes have not been looked at by me. 1/24/2003 3:57:34 PM
|
Alarm Plan Check | | | 1/3/2003 | | PASS |
|
|
|
Plan Modifications - approved.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/3/2003 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 1/3/2003 | | 1/3/2003 | | DONE |
|
|
|
|
Issue permit | | | 1/3/2003 | | DONE |
|
|
|
|
Meeting | | | 1/2/2003 | | DONE |
|
|
|
Met with Steve Larson, Peak Alarm, to discuss plan modifications and make necessary explanatory notations on plans. Plans now ready for review.
|
Alarm Plan Check | | | 12/17/2002 | | FAIL |
|
|
|
This is a resubmittal for modifications necessary to reflect actual field conditions and to conform with a programmed upgrade agreement as approved by the FD. The Application and addendum do not indicate what changes are being made. Many items are clouded on the resubmitted plans, which are not changed form previously approved plans. A new Remote annunciator has been added but is not clouded or mentioned as new in the application/addendum. Two pulls were deleted which are not indicated. Strobes are shown and clouded which per the upgrade agreement are not to be installed at this time. I cannot search the plans to find all the real changes. Phoned Peak Alarm; Steve Larsen is out until after the holidays; spoke with Nathan. Nathan will come pick up one set of plans to revise them to identify all modifications to the previously approved plans and resubmit.
|
Plan assigned to (SAM) | 12/4/2002 | | 12/4/2002 | | DONE |
|
|
|
|
Meeting | | | 11/4/2002 | | DONE |
|
|
|
Meeting held with building owner, building and alarm contractors, tenant owner, architect, Dave Miller, J. Gilliland, Jeff Jones, S. Rogers to discuss owner's concern about required alarm devices in existing vacant and tenanted areas, outside the E occpancies of the Foothills School. D Miller indicated FD willingness to approve a written request from the building owner to allow the existing tenanted and vacant spaces to be provided with a/v devices within 1 year or at the next TI whichever occurs first, with the remainder of the alarm system to be installed per approved plans. Some manual pulls shown on lans are not required and may be deleted; some a/v's cannot be installed because actual conditions do not match the approved plans. The alarm contractr will resubmit plans reflecting these modifications, then field modifications are to be made, then a field inspection will be done and when the alarm system is tested satisfactorily, an OC will be granted to the new Foothills tenant space.
|
Meeting | | | 9/26/2002 | | DONE |
|
|
|
Walk-in meeting with Dick Wilcom and rep's from Mountain Alarm. Reviewed approved plans with them and current status per permit activity comments. He is trying to get another alarm contractor to do the work in what he says are vacant building areas (not shown as vacant on approved plans) and require each tenant to get their own contractor for their portion of the work, so each pays for their own space. I and Mtn Alarm explained the problems of trying to do it that way. We hold this permit applicant responsible for the installation and operation of the entire system as shown on the approved plans. Reaffirmed all work on approved plans is required for approval of the building alarm system before the Foothills builidng permit BLD02-01092 can be signed off. Foothills School is occupying the new space without a permit. Failure to complete this fire alarm permit according to the approved plans in a timely manner may result in FD action to disallow continued school occupancy. Approved plans sent out to be copied for Mr Wilcomb's use.
|
INSP-Conference | 9/17/2002 | 9/17/2002 | 9/17/2002 | P | PART |
Rick Jackson
|
|
|
PHIL ; Phone #: ###-#### Internet Inspection Request from: Annette Moore due to numerous changes proposed by Phil Omas that resubmittals are required 9/17/2002 2:43:10 PM
|
Issue permit | | | 9/11/2002 | | DONE |
|
|
|
|
Alarm Plan Check | | | 9/10/2002 | | PASS |
|
|
|
resubmittal acceptable
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/10/2002 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 9/10/2002 | | 9/10/2002 | | DONE |
|
|
|
|
Telephone call | | | 9/10/2002 | | DONE |
|
|
|
permit ready and fees due
|
Alarm Plan Check | | | 8/19/2002 | | PEND |
|
|
|
Conditional approval granted to allow installation work to begin. Resubmittal information required prior to final approval of plans and issuance of permit. No field inspection allowed until permit has been issued. Review comments discussed with and faxed to Steve Larsen, Peak Alarm and Dick Schultz, Construction mgr.
|
Alarm Plan Check | | | 7/8/2002 | | FAIL |
|
|
|
Application, plans and supporting information are incomplete. Review coments faxed to Peak Alarm.
|
Plan assigned to (SAM) | 6/25/2002 | | 6/27/2002 | | DONE |
|
|
|
6/27/2002 13:18:57 JWA - activity updated through activity FIRA22 from case FIR02-00252.
|
Application received | | | 6/25/2002 | | |
|
|
|
|
Alarm Plan Check | 8/7/2002 | | | | PEND |
|
|
|
8/7 resubmittal under review
|