INSP-Final Inspection | 2/11/2008 | 2/12/2008 | 2/12/2008 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled. Fees have been paid per Marsha.
|
INSP-Final Inspection | 12/17/2002 | 12/20/2002 | 12/20/2002 | A | FAIL |
Troy Cobbley
|
|
|
this permit is ready to final as soon as its paid for as per Marsha at the permit desk 12/20/2002 11:54:00 AM
|
Miscellaneous action | | | 11/14/2002 | | DONE |
|
|
|
2 1/2 ot
|
INSP-Final Inspection | 11/7/2002 | 11/13/2002 | 11/13/2002 | P | FAIL |
Troy Cobbley
|
|
|
provide tamper switch on the gate valve on fire pump test line, verify weather proof pull station assembly, provide hi/low pressure switch for anechoic chamber dry pipe valve 11/14/2002 1:41:05 PM
|
Plan assigned to (SAM) | 7/15/2002 | | 7/25/2002 | | DONE |
|
|
|
7/25/2002 14:57:04 SLR - activity updated through activity FIRA22 from case FIR02-00287.
|
Alarm Plan Check | 7/23/2002 | | 7/25/2002 | | PASS |
|
|
|
John Hatton provided info necessary for review 7/23. Approved with CONDITIONS.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/25/2002 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 7/25/2002 | | 7/25/2002 | | DONE |
|
|
|
|
Telephone call | | | 7/25/2002 | | DONE |
|
|
|
PERMIT READY AND FEES DUE
|
Alarm Plan Check | 7/15/2002 | | 7/22/2002 | | HOLD |
|
|
|
additional information/clarification required to complete review. Hold for telcon with John Hatton, HP to get additional info.
|
Application received | | | 7/15/2002 | | |
|
|
|
|