Permit Information
Permit NumberFIR02-00291
StatusFinaled
Name VIKING AUTOMATIC SPRINKLER CO
Site Address 190 E BANNOCK ST
Project NameSPR ST. LUKES PHASE 1
Customer Number 
ePlanReview 
Description
(PHASE 1 - St. Lukes RMC Fire Code Upgrade) To install a 6" and 3" "Ames ACV 115F" pressure reducing valves in series on a new bypass located off the existing basement fire pump in the "old" basement mechanical room. To install a separate 6" supply feed main in the basement for future separation/connection of high-pressure supplies to the CSP #3. Reference attached plans. This work is to reduce excessive (+175 lbs) pressure created by a previous installation/replaced fire booster pump with a 1000gpm @ 115lb rated fire booster pump (for the East Wing Tower Expansion, under the auspices of the State Fire Marshall's Office). Phase II work shall require separate permitting, plans and approval. The fire sprinkler system work shall comply with NFPA 13-1999, attached review comment and conditions list, as regulated by the Fire Chief. These notes, plans, permit and fire "Inspection Card" are required to be on site as a condition of this work, for witness of compliance verification of minimum code. This permit is not attached to a building permit.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary  9/20/2004  
INSP-Final Inspection4/23/20034/23/20034/23/2003PPASS
DetailsRick Jackson
DOC - Permit Finaled4/23/20034/23/20034/23/2003PPASS
DetailsRick Jackson
Finaled by inspector at 4/23/2003 2:46:55 PM
INSP-Sprinkler Rough-in/Hydro3/11/20033/13/20033/13/2003PPART
DetailsRick Jackson
brad; Phone #: ###-#### Internet Inspection Request from: Annette Moore hydro on new loop okay and high pressure 3/13/2003 1:30:32 PM
INSP-Sprinkler Rough-in/Hydro1/30/20032/5/20032/5/2003AFAIL
DetailsRick Jackson
8:30 will require hydrostatic test of all new piping; need alarm plan submittals for all new tampers 2/5/2003 11:05:57 AM
FIR-Aging Inspection1/30/20031/30/20031/30/2003 PART
DetailsRick Jackson
scheduled for 2/5/03 1/30/2003 12:37:15 PM
INSP-Final Inspection1/30/20031/30/20031/30/2003PCANC
DetailsRick Jackson
brad; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie rescheduled for 2/5 1/30/2003 12:49:34 PM
Miscellaneous action  11/11/2002 DONE
Received "Return Receipt" certified pre-citation letter.
Miscellaneous action  11/7/2002 DONE
Mailed (Certified Mail) Pre-Citation Letter.
Plan assigned to (Bill)7/17/2002 10/31/2002 DONE
10/31/2002 10:15:43 JWA - activity updated through activity FIRA22 from case FIR02-00291.
Sprinkler Plan Check8/1/2002 10/31/2002 PASS
DetailsBill Alexander
Clarifications (work scope) and time frame provided.
PLANS/APPL TAKEN TO FRONT DESK  10/31/2002 DONE
DetailsBill Alexander
Inspection Record Card- Fire10/31/2002 10/31/2002 DONE
Issue permit  10/31/2002 DONE
Telephone call  10/29/2002 DONE
Faxed revised review to St. Lukes and Viking (to motivate a response) on time schedule.
Miscellaneous action  10/29/2002 DONE
Received a faxed letter from St. Lukes on a time schedule for completion of work. Put origignal and copy of review notes in Dave Millers (floor) mail box for signed approval.
Telephone call  9/11/2002 DONE
Ron Larsen returned call and indicated that St. Lukes wants firm price prior to confirming to schedule of which he will be meeting with them Friday the 13th.
Telephone call  9/10/2002 DONE
DetailsBill Alexander
Called for Ron Larsen questioning when time schedule of approved phased work would be submitted in order to release permit. Left message to call back.
Meeting  8/30/2002 DONE
Met with Ron Larson. Submitted more detail on building and sprinkler objectives. Scope of work is more defined in this permit (verbally). Will not be adding RPV's but will seperate supplies. Asked for a letter detailing scope schedule (which was one question not answered as of this date).
Meeting  8/12/2002 DONE
DetailsBill Alexander
Meeting with Dave Brown (St. Lukes), Ron Larson (Viking Automatic Sprinkler), Rick Jackson, Sam Rogers, Bill Alexander (City-PDS).
Went through scope of work, possible problems (future annual testing of valves), actual correct plot plan that shows all facilities affected, time schedule of work for completion.
Dave Brown said he will have to get back on the schedule. (Viking plans work shown is basically the first phase).
Telephone call  8/9/2002 DONE
DetailsBill Alexander
Called Designer to come in and have a meeting on what should be shown, provided and verified.
Telephone call  7/22/2002 DONE
plans denied need to resubmit
Sprinkler Plan Check7/17/2002 7/19/2002 FAIL
DetailsBill Alexander
One plan set provided. Requires 3 minimum. Work appears limited and deficient in completion for code compliance upgrade. Require approved schedule/phase to complete deficiency.
Telephone call  7/18/2002 DONE
Faxed copy of failed review to Viking.
Application received  7/17/2002  
Miscellaneous action  7/17/2002 DONE
DetailsBill Alexander
Walked projected with Ron Larsen (Viking). Found most of what appears to be phase 1 work to be completed with no vavlid permit.
Case Summary    DONE