INSP-Final Inspection | 10/24/2002 | 10/24/2002 | 10/24/2002 | P | PASS |
Troy Cobbley
|
|
|
fire finaled
|
DOC - Permit Finaled | 10/24/2002 | 10/24/2002 | 10/24/2002 | P | PASS |
Troy Cobbley
|
|
|
Finaled by inspector at 10/24/2002 2:45:10 PM
|
INSP-Sprinkler Rough-in/Hydro | 10/17/2002 | 10/17/2002 | 10/17/2002 | A | PASS |
Troy Cobbley
|
|
|
above ground hydro test is OK
|
INSP-Final Inspection | 10/16/2002 | 10/16/2002 | 10/16/2002 | P | FAIL |
Troy Cobbley
|
|
|
all items on the correction notice have been taken care of except for the addition of heads over the egress corridor and the lobbies
|
INSP-Sprinkler Rough-in | 10/14/2002 | 10/14/2002 | 10/14/2002 | P | FAIL |
Troy Cobbley
|
|
|
provide additional hangers in 1st floor corridor, provide 4 way eq bracing in the northwest corner of the 2nd floor, provide upright instead of a pendant head in the 1st floor electrical room, provide adequate sprinkler coverage over lobby/egress corridor on the 1st floor.
|
Issue and Print Permit | | | 7/30/2002 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 7/29/2002 | | 7/29/2002 | | DONE |
|
|
|
|
Telephone call | | | 7/29/2002 | | DONE |
|
|
|
permit ready and fees due
|
Plan assigned to (Bill) | 7/25/2002 | | 7/26/2002 | | DONE |
|
|
|
7/26/2002 15:49:18 JWA - activity updated through activity FIRA22 from case FIR02-00304.
|
Sprinkler Plan Check | 7/25/2002 | | 7/26/2002 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/26/2002 | | DONE |
Bill Alexander
|
|
|
|
Application received | | | 7/25/2002 | | |
|
|
|
|
Case Summary | | | | | DONE |
|
|
|
|