INSP-Final Inspection | 10/30/2002 | 10/31/2002 | 10/31/2002 | A | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 10/30/2002 at 15:10:53. Contact: ###-####.
|
DOC - Permit Finaled | 10/31/2002 | 10/31/2002 | 10/31/2002 | P | PASS |
Rick Jackson
|
|
|
Finaled by inspector at 10/31/2002 6:41:59 PM
|
INSP-Final Inspection | 9/12/2002 | 9/13/2002 | 9/13/2002 | A | CANC |
Rick Jackson
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung not a final inspection see flush for this date 9/13/2002 1:40:39 PM
|
INSP-Supply line flush | 9/13/2002 | 9/13/2002 | 9/13/2002 | P | PART |
Rick Jackson
|
|
|
flushed underground and hydro okay for underground; attempted to forward flow the backflow preventer - couldn't get the required gpm's with the equipment on hand
|
INSP-Sprinkler Rough-in | 9/12/2002 | 9/12/2002 | 9/12/2002 | P | PART |
Rick Jackson
|
|
|
PIV installed and okay to cover
|
INSP-Sprinkler Rough-in/Hydro | 9/9/2002 | 9/10/2002 | 9/10/2002 | P | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 09/09/2002 at 08:01:00. Contact: ###-####. heads overspaced at corridor wall in showroom; add head at main entrance; PIV not installed; FDC will rewuire sign to prevent parking blocking it; add 911 on outside bell; test alarms when installed; hydro okay 9/10/2002 3:57:43 PM
|
Sprinkler Plan Check | 9/10/2002 | | 9/10/2002 | | PASS |
Bill Alexander
|
|
|
Stamped corrected plans
|
Issue permit | | | 9/6/2002 | | DONE |
|
|
|
|
Sprinkler Plan Check | 9/4/2002 | | 9/4/2002 | | PASS |
Bill Alexander
|
|
|
Modified underground PIV location. Returned acceptance with fax and letter.
|
Inspection Record Card- Fire | 8/29/2002 | | 8/29/2002 | | DONE |
|
|
|
|
Telephone call | | | 8/29/2002 | | DONE |
|
|
|
permit ready and fees due
|
Sprinkler Plan Check | 8/21/2002 | | 8/28/2002 | | PART |
Bill Alexander
|
|
|
Required revised plan submittal meeting minimum code.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/28/2002 | | DONE |
Bill Alexander
|
|
|
|
Plan assigned to (Bill) | 7/26/2002 | | 8/28/2002 | | DONE |
|
|
|
8/28/2002 15:43:16 JWA - activity updated through activity FIRA22 from case FIR02-00310.
|
Sprinkler Plan Check | 7/26/2002 | | 8/8/2002 | | FAIL |
Bill Alexander
|
|
|
Warehouse storage piping design for OH-1 Occupancy and should be OH-2. No outside control on systems. Heads overspaced and areas have "shadowing". Need to verify cavity with calcs. Need backflow forward flow test connection. Need dry system capacity. Need compressor data submittals. Need final calculation head analysis. Need to verify hydrant location and FDC access on the plans. Need more than a generic earthquake detail (engineering required). 155 degree heads in the cavities and etc.
|
Miscellaneous action | | | 8/8/2002 | | DONE |
|
|
|
Took plans to front desk for calling and returning. Faxed copy of review to Grinnell (2:45pm)
|
Telephone call | | | 8/8/2002 | | DONE |
|
|
|
CALLED TO HAVE DENIED PLANS PICKED UP
|
Application received | | | 7/26/2002 | | |
|
|
|
|
Case Summary | | | | | DONE |
|
|
|
|