INSP-Alarm Testing | 11/6/2003 | 11/6/2003 | 11/6/2003 | P | PASS |
Rick Jackson
|
|
|
###-#### David//verify that knox box is in; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
DOC - Permit Finaled | 11/6/2003 | 11/6/2003 | 11/6/2003 | P | PASS |
Rick Jackson
|
|
|
Finaled by inspector at 11/6/2003 1:04:36 PM
|
INSP-Alarm Testing | 9/11/2003 | 9/15/2003 | 9/15/2003 | P | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 9/11/2003 at 9:01:32 AM. Contact: ###-####. everything concerning the alarm system is okay now - however a Knox Box is required; call ###-#### to order 9/15/2003 2:33:13 PM
|
(F) Reprint permit | | | 5/9/2003 | | |
|
|
|
|
INSP-Final Inspection | 2/24/2003 | 2/24/2003 | 2/24/2003 | P | FAIL |
Rick Jackson
|
|
|
david; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie need knox box; map for all initiating devices; NAC's not working; secondary phone line not reporting trouble; need horn/strobe in conference room 2/24/2003 4:13:07 PM
|
INSP-Sprinkler Rough-in/Hydro | 2/14/2003 | 2/21/2003 | 2/21/2003 | P | NR |
Rick Jackson
|
|
|
Phone #: ###-#### Internet Inspection Request from: Jack Schmidt rescheduled for 2/24/03 per contractor 2/21/2003 9:24:37 AM
|
Issue and Print Permit | | | 1/30/2003 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 1/9/2003 | | 1/9/2003 | | DONE |
|
|
|
|
Telephone call | | | 1/9/2003 | | DONE |
|
|
|
permit ready and fees due
|
Alarm Plan Check | | | 1/8/2003 | | PASS |
|
|
|
Resubmittal acceptable with conditions to be field verified
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/8/2003 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 8/9/2002 | | 1/8/2003 | | DONE |
|
|
|
1/8/2003 17:18:29 SLR - activity updated through activity FIRA22 from case FIR02-00323.
|
Application received | | | 12/20/2002 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 12/20/2002 | | 12/20/2002 | | DONE |
|
|
|
|
Telephone call | | | 11/1/2002 | | DONE |
|
|
|
called Advanced Tech, regarding status of resubmittal, spoke with secretary; she will have Jack Schmidt CB.
|
Alarm Plan Check | 9/19/2002 | | 9/30/2002 | | FAIL |
|
|
|
Failed but device locations are acceptable. Conditional approval is granted to allow field installation to begin prior to receiving the required resubmittal. Field approval will not be allowed until the required resubmittal has been received and approved. Review faxed to Advanced Technologies.
|
Telephone call | | | 9/27/2002 | | DONE |
|
|
|
Called Advanced Technology, Joe Natalie, I gave approval to start installation, pending reciept of my written review comments and resubmittal ro correct design deficiencies. Review failed for several reasons but none affect device locations or circuitry, so installstion allowed.
|
Application received | | | 9/19/2002 | | DONE |
|
|
|
resubmittal received
|
Telephone call | | | 9/19/2002 | | DONE |
|
|
|
I called Jack Schmidt, Advanced Technolies, to advise him that we cannot review the resubmitted FA plans until the Building review has been completed.
|
Alarm Plan Check | | | 8/26/2002 | | FAIL |
|
|
|
The FA application idicates this work is for an E occupancy on the 4th floor (Ste #400). The Bldg TI permit shown on FA application is incorrect (for a 1st flr office occupancy). Cannot locate an applicable TI permit number under the address search of permit system; faxed request to Alarm company to provide the correct number.
|
Application received | | | 8/9/2002 | | |
|
|
|
|