(F) Reprint permit | | | 7/15/2003 | | |
|
|
|
|
INSP-Final Inspection | 12/12/2002 | 12/12/2002 | 12/12/2002 | A | PASS |
Troy Cobbley
|
|
|
fire alarm system finaled
|
DOC - Permit Finaled | 12/12/2002 | 12/12/2002 | 12/12/2002 | P | PASS |
Troy Cobbley
|
|
|
Finaled by inspector at 12/12/2002 11:38:08 AM
|
INSP-Alarm Testing | 12/11/2002 | 12/13/2002 | 12/11/2002 | P | CANC |
Troy Cobbley
|
|
|
Troy, If you could call me and let me know as far in advance when you will be able to make it out to Emser Tile on Friday I would appreciate it. My cell number is ###-####, and the office is ###-####.
Thanks,
Jason; Phone #: ###-#### Internet Inspection Request from: Jason Minnick Inspection cancelled from web by: Jason Minnick
|
INSP-Sprinkler Rough-in/Hydro | 12/11/2002 | 12/11/2002 | 12/11/2002 | P | CANC |
Troy Cobbley
|
|
|
the fire alarm contractor could not make it to the inspection 12/11/2002 3:42:44 PM
|
INSP-Final Inspection | 12/3/2002 | 12/3/2002 | 12/3/2002 | A | FAIL |
Troy Cobbley
|
|
|
relocate the smoke detector above the FACP to the deck, provide the correct battery size, provide the correct Boise Fire Dept. approved knox key box, provide lock on breaker and paint, neither phone line give a trouble when disconnected. I stopped the inspection. No other items looked at or tested
|
INSP-Alarm Testing | 11/26/2002 | 12/2/2002 | 12/2/2002 | P | CANC |
Troy Cobbley
|
|
|
cancelled by the contractor until tomorrow 12/2/2002 4:25:30 PM
|
Issue and Print Permit | | | 8/29/2002 | | |
|
|
|
|
Plan assigned to (SAM) | 8/14/2002 | | 8/28/2002 | | DONE |
|
|
|
8/28/2002 14:12:04 SLR - activity updated through activity FIRA22 from case FIR02-00332.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/28/2002 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/28/2002 | | 8/28/2002 | | DONE |
|
|
|
|
Telephone call | | | 8/28/2002 | | DONE |
|
|
|
PERMIT READY AND FEES DUE
|
Application received | | | 8/14/2002 | | |
|
|
|
|
Alarm Plan Check | | | 8/28/2001 | | PASS |
|
|
|
|