INSP-Final Inspection | 3/19/2004 | 3/19/2004 | 3/19/2004 | P | PASS |
Troy Cobbley
|
|
|
fire sprinklers finaled
|
DOC - Permit Finaled | 3/19/2004 | 3/19/2004 | 3/19/2004 | P | PASS |
Troy Cobbley
|
|
|
Finaled by inspector at 3/19/2004 12:56:25 PM
|
INSP-Final Inspection | 3/18/2004 | 3/18/2004 | 3/18/2004 | P | CANC |
Troy Cobbley
|
|
|
forward flush
|
INSP-Sprinkler Rough-in/Hydro | 9/24/2002 | 9/25/2002 | 9/25/2002 | P | PASS |
Troy Cobbley
|
|
|
Above ground and underground hydro test OK. Above ground piping rough-in is OK. Drains, FDC and alarm still needs to be completed 9/26/2002 12:52:44 PM
|
INSP-Sprinkler Rough-in/Hydro | 9/25/2002 | 9/25/2002 | 9/25/2002 | P | FAIL |
Troy Cobbley
|
|
|
some of the retaining straps are not wraped around the trusses, the sprinkler pipe in the riser room can not be hung from the angle iron supports on the bottom of the trusses, move the hanger to the top of the truss, in the southeast corner of the building the 1 1/4" til back piece of pipe exceeds the 48" allowed for a unsupported arm over.
|
INSP-Sprinkler Rough-in/Hydro | 9/11/2002 | 9/12/2002 | 9/12/2002 | A | PART |
Troy Cobbley
|
|
|
sprinkler rough in is not ready yet but the underground flush passed 9/12/2002 9:07:04 AM
|
Issue and Print Permit | | | 8/26/2002 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/23/2002 | | 8/23/2002 | | DONE |
|
|
|
|
Telephone call | | | 8/23/2002 | | DONE |
|
|
|
PERMIT READY AND FEES DUE
|
Plan assigned to (Bill) | 8/21/2002 | | 8/23/2002 | | DONE |
|
|
|
8/23/2002 13:53:28 JWA - activity updated through activity FIRA22 from case FIR02-00347.
|
Sprinkler Plan Check | 8/21/2002 | | 8/23/2002 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/23/2002 | | DONE |
Bill Alexander
|
|
|
|
Application received | | | 8/21/2002 | | |
|
|
|
|
Case Summary | | | | | DONE |
|
|
|
|