INSP-Final Inspection | 9/23/2002 | 9/23/2002 | 9/23/2002 | P | PASS |
Troy Cobbley
|
|
|
fire sprinkler finaled 9/23/2002 3:00:12 PM
|
DOC - Permit Finaled | 9/23/2002 | 9/23/2002 | 9/23/2002 | P | PASS |
Troy Cobbley
|
|
|
Finaled by inspector at 9/23/2002 3:00:21 PM
|
Sprinkler Plan Check | 9/6/2002 | | 9/6/2002 | | PASS |
Bill Alexander
|
|
|
Provided revised plan of as-built with letter for TVFP taking responsibility of OH-2 density requirements, even though design is deficient for OH pipe schedule as submitted.
|
Telephone call | | | 9/6/2002 | | DONE |
|
|
|
Called Troy Cobley to accept revised plan/installation meeting letter as stated and attached. (Put copy in mail box).
|
INSP-Final Inspection | 9/4/2002 | 9/5/2002 | 9/5/2002 | A | FAIL |
Troy Cobbley
|
|
|
too many heads on 1 1/4" branchline 9/5/2002 8:28:00 AM
|
INSP-Final Inspection | 9/3/2002 | 9/3/2002 | 9/3/2002 | P | FAIL |
Troy Cobbley
|
|
|
sprinkler contractor did not address note #1 for the 3/4" orfice heads in a pipe scheduled system 9/3/2002 4:19:14 PM
|
Plan assigned to (Bill) | 8/21/2002 | | 8/29/2002 | | DONE |
|
|
|
8/29/2002 08:53:11 JWA - activity updated through activity FIRA22 from case FIR02-00349.
|
Sprinkler Plan Check | 8/21/2002 | | 8/29/2002 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/29/2002 | | DONE |
Bill Alexander
|
|
|
|
Inspection Record Card- Fire | 8/29/2002 | | 8/29/2002 | | DONE |
|
|
|
|
Telephone call | | | 8/29/2002 | | DONE |
|
|
|
PERMIT READY AND FEES DUE
|
Inspection Record Card- Fire | 8/29/2002 | | 8/29/2002 | | DONE |
|
|
|
|
Issue and Print Permit | | | 8/29/2002 | | DONE |
|
|
|
|
Application received | | | 8/21/2002 | | |
|
|
|
|
Case Summary | | | | | DONE |
|
|
|
|