INSP-Final Inspection | 9/18/2003 | 9/18/2003 | 9/18/2003 | P | PASS |
Troy Cobbley
|
|
|
This is Patricks Cell Phone.
Have a Great Day Today.; Phone #: ###-#### Internet Inspection Request from: Terry Owsley
|
DOC - Permit Finaled | 9/18/2003 | 9/18/2003 | 9/18/2003 | P | PASS |
Troy Cobbley
|
|
|
Finaled by inspector at 9/18/2003 4:38:50 PM
|
INSP-Final Inspection | 4/23/2003 | 4/25/2003 | 4/25/2003 | A | FAIL |
Troy Cobbley
|
|
|
Provide map for fire alarm system, remove old fire alarm equipment, reverify alarm signals 4/25/2003 9:57:45 AM
|
INSP-Final Inspection | 4/7/2003 | 4/8/2003 | 4/8/2003 | A | CANC |
Rick Jackson
|
|
|
PATRICK; Phone #: ###-#### Internet Inspection Request from: Darla Downs per Troy 4/8/2003 7:44:54 AM
|
INSP-Final Inspection | 4/7/2003 | 4/7/2003 | 4/7/2003 | P | CANC |
Troy Cobbley
|
|
|
Troy, This is Patricks cell.
Thanks Have a good day.; Phone #: ###-#### Internet Inspection Request from: Terry Owsley TROY CALLED TO HAVE ME CANC THIS INSPECTION AND TO PUT IT IN FOR 4-8-03 AM
|
INSP-Final Inspection | 4/4/2003 | 4/4/2003 | 4/4/2003 | P | FAIL |
Troy Cobbley
|
|
|
Horn/strobes have been added in deficiant areas and the sound level is now ok. No other items tested 4/4/2003 4:00:19 PM
|
INSP-Final Inspection | 3/28/2003 | 3/31/2003 | 3/31/2003 | P | FAIL |
Troy Cobbley
|
|
|
This is Patrick Cell; Phone #: ###-#### This inspection turned into a conference. The a/v's work but devices need to be added on a mezzanine area and in multiple offices. Also the audio does not meet the minimum 75 db requirements in all areas. The fire sprinkler devices have been tested but the signals did not come in right. All pull stations worked. No other devices tested. 3/31/2003 3:19:21 PM
|
INSP-Final Inspection | 11/19/2002 | 11/20/2002 | 11/20/2002 | A | FAIL |
Troy Cobbley
|
|
|
provide mechanical plans, provide additional duct smoke detectors as required and resubmit plans for review, duct detectors did not shut down the hvac units as required, remove all non functioning fire alarm devices (old system), and relocate the manual pull stations as per the review comments.. NO OTHER ITEMS VERIFIED OR TESTED 11/20/2002 11:11:31 AM
|
Issue permit | | | 10/30/2002 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 10/29/2002 | | 10/29/2002 | | DONE |
|
|
|
|
Telephone call | | | 10/29/2002 | | DONE |
|
|
|
permit ready
|
Alarm Plan Check | 10/23/2002 | | 10/28/2002 | | PASS |
|
|
|
resubmittal approved with CONDITIONS to be field verified.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/28/2002 | | DONE |
|
|
|
|
Alarm Plan Check | 10/18/2002 | | 10/18/2002 | | HOLD |
|
|
|
3/8/02 - resubmittal package not acceptable. Hold for Protex to come in on Monday to properly assemble the resubmittal into complete sets, identify changes, and address all items on the previous review.
|
Alarm Plan Check | | | 9/25/2002 | | FAIL |
|
|
|
Application and plans unacceptable. Review comments faxed to Protex and Apex.
|
Telephone call | | | 9/24/2002 | | DONE |
|
|
|
Plans are grsossly inadequate. Called Apex to see if pages were missing. They did not review the submittal by Protex and requested I copy them in on my review comments.
|
Application received | | | 9/10/2002 | | |
|
|
|
|