INSP-Final Inspection | 3/30/2010 | 3/30/2010 | 3/30/2010 | P | PASS |
Forrest France
|
|
|
Aging fire sprinkler permit finaled.
|
FIR-Aging Inspection | 3/29/2010 | 3/29/2010 | 3/30/2010 | | DONE |
Forrest France
|
|
|
Final scheduled.
|
Miscellaneous action | | | 3/12/2010 | | DONE |
|
|
|
Sent email requesting project status.
|
INSP-Sprinkler Rough-in/Hydro | 12/13/2002 | 12/13/2002 | 12/13/2002 | P | FAIL |
Rick Jackson
|
|
|
Would like to Hydro new wash bay and rough inspection for the other areas. Scott Carter is foreman on site. ###-####; Phone #: ###-#### Internet Inspection Request from: Trent Bice hydro and r/i okay; installed per plans; need spare heads; need alarm plans for sprinkler monitoring; needs knox box 12/13/2002 2:18:51 PM
|
Issue permit | | | 11/19/2002 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 11/18/2002 | | 11/18/2002 | | DONE |
|
|
|
|
Telephone call | | | 11/18/2002 | | DONE |
|
|
|
PERMIT READY AND FEES DUE
|
Plan assigned to (Bill) | 10/16/2002 | | 11/18/2002 | | DONE |
|
|
|
11/18/2002 10:34:18 JWA - activity updated through activity FIRA22 from case FIR02-00413.
|
Sprinkler Plan Check | 11/12/2002 | | 11/18/2002 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/18/2002 | | DONE |
Bill Alexander
|
|
|
|
Plan resubmittals received | | | 11/12/2002 | | DONE |
Bill Alexander
|
|
|
|
Plan assigned to (Bill) | 11/8/2002 | | 11/8/2002 | | DONE |
|
|
|
|
Sprinkler Plan Check | 10/17/2002 | | 10/23/2002 | | FAIL |
Bill Alexander
|
|
|
Need submittal data of backflow preventer. Means shall be provided downstream of all backflow prevention valves for flow tests at system demand. Need submittal data expansion chamber. Need clarification of wall type/s where earthquake bracing shall be attached. Verify connections to the same meeting minimum code. Need clearer enlargement and clarification on section detail (with calculation nodes) between A6 and A7, (antifreeze loop). Need to show the elevation (with dimensioning) of backflow preventer. Include type of control valves and required tampering. Need existing riser section detail with some dimensioning of pertinent points and node identifications.
No roof structure construction clarification provided in existing building. Lines adding (overhead doors and near demising wall) need identified hangers and how they to be supported and attached, etc.
|
Miscellaneous action | | | 10/23/2002 | | DONE |
Bill Alexander
|
|
|
Took submittal and review notes to front desk for calling and returning to submitter.
|
Telephone call | | | 10/23/2002 | | DONE |
|
|
|
called for a pick up plans failed
|
Application received | | | 10/16/2002 | | |
|
|
|
|
Case Summary | | | | | DONE |
|
|
|
|