Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR02-00439
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 150 N CAPITOL BLVD
Project NameSPR CITY HALL EXP-1ST FLR
Customer Number 
ePlanReview 
Description
(BOISE CITY ADMINISTRATIVE OFFICES)(CITY HALL EXPANSION-1st FLOOR) (ARTS COMMISSION, DFM & UTILITY BILLING) To perform selective fire sprinkler demolition of entire 1st floor and maintain fire sprinkler protection throughout during construction. To modify, add, relocate the existing fire sprinkler system for the remodel of 11,975-ft/2, floor area for use as offices and support areas. Sprinkler work is related to interior, non-bearing, fire-resistive walls to create offices, work rooms, conference rooms, training room & break room and new suspended grid ceiling system. NOTE: This building is fully sprinklered. The fire sprinkler system work shall comply with NFPA 13?1999, attached review comment and conditions list; regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of meeting minimum code conditions. This permit is attached to building permit: BLD02-01413.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  3/12/2010 DONE
Sent email requesting project status.
Final inspection  5/29/2009 DONE
Permit was finaled on 05-09-09 by inspector 325
Meeting  11/27/2007 DONE
Reviewed project status with Mike Timmerman. He willl follow up with Bob Archibald to get remaining items resolved and permit finaled.
INSP-Final Inspection3/6/20033/6/20033/6/2003AFAIL
DetailsRick Jackson
sprinkler head at 7 ft level in east comm room; ceiling height requires removal of this head as there are two at ceiling height; need timeline for correcting standpipe interconnection and sprinklering all unsprinklered areas as requested on plan review notes
INSP-Sprinkler Rough-in/Hydro12/20/200212/20/200212/20/2002PFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 12/20/2002 at 09:51:56. Contact: ###-####. overspaced in several rooms - identified on plans and c/n; hangers needed within 1 foot from end of pipe 12/20/2002 5:30:56 PM
INSP-Sprinkler Rough-in/Hydro12/19/200212/19/200212/19/2002PPASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 12/19/2002 at 08:39:56. Contact: ###-####.
Inspection Record Card- Fire12/2/2002 12/2/2002 DONE
Telephone call  12/2/2002 DONE
called 12-2-02
Issue permit  12/2/2002 DONE
Plan assigned to (Bill)11/8/2002 12/2/2002 DONE
12/2/2002 11:09:42 JWA - activity updated through activity FIRA22 from case FIR02-00439.
Sprinkler Plan Check11/21/2002 12/2/2002 PASS
DetailsBill Alexander
PLANS/APPL TAKEN TO FRONT DESK  12/2/2002 DONE
DetailsBill Alexander
Plan assigned to (Bill)11/21/2002 11/21/2002 DONE
Plan resubmittals received  11/21/2002 DONE
DetailsBill Alexander
Sprinkler Plan Check11/12/2002 11/20/2002 FAIL
DetailsBill Alexander
A. No existing design limits/information provided on the plans.
B. No hanger attachment information provided.
C. Verification of proposed use of appurtenance, which was not addressed.
Telephone call  11/20/2002 DONE
Faxed copy of failed review.
Miscellaneous action  11/20/2002 DONE
Took failed plans to front desk for calling and returning for corrections.
Miscellaneous action  11/15/2002 DONE
Inspected first floor and found Treasure Valley working without a valvid permit. Double fees and pre-citation shall be imposed.
Application received  11/8/2002  
Case Summary    DONE