INSP-Final Inspection | 2/24/2003 | 2/25/2003 | 2/25/2003 | A | PASS |
Troy Cobbley
|
|
|
duplicate inspection 2/25/2003 10:44:50 AM
|
INSP-Final Inspection | 2/25/2003 | 2/25/2003 | 2/25/2003 | A | PASS |
Troy Cobbley
|
|
|
Fire alarms for the west half of the 5th floor have been finaled
|
DOC - Permit Finaled | 2/25/2003 | 2/25/2003 | 2/25/2003 | A | PASS |
Troy Cobbley
|
|
|
Finaled by inspector at 2/25/2003 10:43:50 AM
|
INSP-Alarm Testing | 2/14/2003 | 2/14/2003 | 2/14/2003 | P | PART |
Troy Cobbley
|
|
|
Inspected the fire/smoke dampers and the ones inspected operated correctly. No other devices were tested
|
Inspection Record Card- Fire | 1/28/2003 | | 1/28/2003 | | DONE |
|
|
|
|
Telephone call | | | 1/28/2003 | | DONE |
|
|
|
CALLED 1-28-03
|
Issue and Print Permit | | | 1/28/2003 | | DONE |
|
|
|
|
Alarm Plan Check | | | 1/27/2003 | | PASS |
|
|
|
REsubmittal acceptable
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/27/2003 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 11/27/2002 | | 1/27/2003 | | DONE |
|
|
|
1/27/2003 19:20:24 SLR - activity updated through activity FIRA22 from case FIR02-00474.
|
Plan resubmittals received | | | 1/14/2003 | | DONE |
|
|
|
|
Meeting | | | 1/10/2003 | | DONE |
|
|
|
Reviewed revised plans. Calculaitons still not adequate; will revise. Discussed methods of damper release and AHU shut down, which will be acceptable. To resubmit plans later.
|
Alarm Plan Check | | | 12/31/2002 | | FAIL |
|
|
|
Faxed review comments to Synergy.
|
Plan assigned to (SAM) | 12/13/2002 | | 12/13/2002 | | DONE |
|
|
|
|
Plan resubmittals received | | | 12/13/2002 | | DONE |
|
|
|
|
Alarm Plan Check | | | 12/6/2002 | | FAIL |
|
|
|
Plans grossly inadequate; only partial review conducted. List of deficiencies faxed to designer, Synergy Engineers.
|
Application received | | | 11/27/2002 | | |
|
|
|
|