Permit Information
Permit NumberFIR02-00477
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 601 W GOWEN RD
Project NameSPR WPS Racking & Changes
Customer Number 
ePlanReview 
Description
* WESTERN POWER SPORTS * To modify and add fire sprinkler protection for added racking in a 106,964 ft/2 type II-N building permitted for B, S1, A3 occupancies. S1 includes High Piled Combustible Storage of Group "A" Plastics and Tire storage. This work entails modification to the existing fire sprinkler risers with the installation of a 100 gpm fire booster pump, jockey pump, controllers, modified roof protection for Tire Storage (for increase storage elevation), a 4th level of mezzanine racking, added racking over and existing concrete mezzanine and added face fire sprinkler protection. The fire sprinkler system installation and related work shall comply (but may not be limited) to: NFPA 13-1999, 20-1999, 72-1999, attached review comment and conditions list, as regulated by the Boise City Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is not attached to a building permit at this date. NOTE: The approval of this fire protection permit does not allow the actual installation of any added or modified and use of racking without the required building permit approval. Fire sprinkler shell (BLD01-00197) and original T.I. (BLD01-01238) was permitted under: FIR01-00031, which was connected to building shell permit: BLD01-00197. Underground fire line is existing and previously permitted under: FIR01-00096, connected to grading permit: BLD01-00094. Original racking permit done under BLD01-01592.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection12/8/200312/8/200312/8/2003PPASS
DetailsRick Jackson
DOC - Permit Finaled12/8/200312/8/200312/8/2003PPASS
DetailsRick Jackson
Finaled by inspector at 12/8/2003 3:29:09 PM
INSP-Sprinkler Rough-in/Hydro11/17/200311/17/200311/17/2003PFAIL
DetailsRick Jackson
Would like to do final walk through on fire sprinklers and do flow test for fire pump. We would like to schedule the inspection at about 1:00 pm; Phone #: ###-#### Internet Inspection Request from: Trent Bice tested pump for flow at 150% and there is 25 psi on supply; will need pump certification papers; spare heads; sign on pump room door; no floor drain; 11/17/2003 4:59:26 PM
INSP-Sprinkler Rough-in/Hydro11/5/200311/6/200311/5/2003PCANC
DetailsRick Jackson
Please call 1 hour prior to arrival; Phone #: ###-#### Internet Inspection Request from: Trent Bice Inspection cancelled from web by: Trent Bice
INSP-Sprinkler Rough-in/Hydro8/14/20038/15/20038/15/2003PPART
DetailsRick Jackson
Call prior to arrival so that we can have system charged. Foremans name is Rudi.; Phone #: ###-#### Internet Inspection Request from: Trent Bice hydro on perimeter racking okay 8/15/2003 3:41:20 PM
INSP-Sprinkler Rough-in/Hydro7/28/20037/29/20037/29/2003APART
DetailsRick Jackson
third floor mezz okay; hose valves not completed for this level 7/29/2003 9:33:35 AM
INSP-Sprinkler Rough-in/Hydro7/28/20037/28/20037/28/2003PPART
DetailsRick Jackson
Please call 1 hour before inspection so we can set at 200lbs. Thank you ; Phone #: ###-#### Internet Inspection Request from: Trent Bice hydro on 3rd floor mezz okay; will continue rough in tomorrow 7/28/2003 3:32:26 PM
FIR-Aging Inspection7/9/20037/9/20037/9/2003 PASS
DetailsRick Jackson
talked to Trent and he said the work is in progress and they are 3 weeks out 7/10/2003 9:56:53 AM
Inspection Record Card- Fire4/9/2003 4/9/2003 DONE
Telephone call  4/9/2003  
CALLED 4-9-03
Issue and Print Permit  4/9/2003 DONE
Sprinkler Plan Check4/2/2003 4/8/2003 PASS
DetailsBill Alexander
PLANS/APPL TAKEN TO FRONT DESK  4/8/2003 DONE
DetailsBill Alexander
Plan assigned to (Bill)11/27/2002 4/8/2003 DONE
4/8/2003 16:29:25 JWA - activity updated through activity FIRA22 from case FIR02-00477.
Plan resubmittals received  4/1/2003 DONE
Miscellaneous action  2/13/2003 DONE
Sent letter (mail) requesting information on status of resubmittals.
Telephone call  1/27/2003 DONE
Called Shawn Fenneron (designer) and requested revised covereage calculations which include requirements of roof and in-rack sprinkler combination flowing.
Sprinkler Plan Check1/21/2003 1/27/2003 FAIL
DetailsBill Alexander
Application received  1/21/2003 DONE
Plan assigned to (Bill)1/21/2003 1/21/2003 DONE
Plan resubmittals received  1/21/2003  
DetailsBill Alexander
Required roof and inrack sprinkler calc verification. (Not mezzanine and inrack sprinkler calc verification). Waiting for revised calcs.
Telephone call  12/13/2002 DONE
plans denied... called to return
Sprinkler Plan Check11/27/2002 12/12/2002 FAIL
DetailsBill Alexander
Fire sprinkler design does not meet installation requirements for use and commodity.
Miscellaneous action  12/12/2002 DONE
Took plans back to front desk for calling and returning for corrections
Application received  11/27/2002