INSP-Final Inspection | 12/8/2003 | 12/8/2003 | 12/8/2003 | P | PASS |
Rick Jackson
|
|
|
|
DOC - Permit Finaled | 12/8/2003 | 12/8/2003 | 12/8/2003 | P | PASS |
Rick Jackson
|
|
|
Finaled by inspector at 12/8/2003 3:29:09 PM
|
INSP-Sprinkler Rough-in/Hydro | 11/17/2003 | 11/17/2003 | 11/17/2003 | P | FAIL |
Rick Jackson
|
|
|
Would like to do final walk through on fire sprinklers and do flow test for fire pump. We would like to schedule the inspection at about 1:00 pm; Phone #: ###-#### Internet Inspection Request from: Trent Bice tested pump for flow at 150% and there is 25 psi on supply; will need pump certification papers; spare heads; sign on pump room door; no floor drain; 11/17/2003 4:59:26 PM
|
INSP-Sprinkler Rough-in/Hydro | 11/5/2003 | 11/6/2003 | 11/5/2003 | P | CANC |
Rick Jackson
|
|
|
Please call 1 hour prior to arrival; Phone #: ###-#### Internet Inspection Request from: Trent Bice Inspection cancelled from web by: Trent Bice
|
INSP-Sprinkler Rough-in/Hydro | 8/14/2003 | 8/15/2003 | 8/15/2003 | P | PART |
Rick Jackson
|
|
|
Call prior to arrival so that we can have system charged. Foremans name is Rudi.; Phone #: ###-#### Internet Inspection Request from: Trent Bice hydro on perimeter racking okay 8/15/2003 3:41:20 PM
|
INSP-Sprinkler Rough-in/Hydro | 7/28/2003 | 7/29/2003 | 7/29/2003 | A | PART |
Rick Jackson
|
|
|
third floor mezz okay; hose valves not completed for this level 7/29/2003 9:33:35 AM
|
INSP-Sprinkler Rough-in/Hydro | 7/28/2003 | 7/28/2003 | 7/28/2003 | P | PART |
Rick Jackson
|
|
|
Please call 1 hour before inspection so we can set at 200lbs. Thank you ; Phone #: ###-#### Internet Inspection Request from: Trent Bice hydro on 3rd floor mezz okay; will continue rough in tomorrow 7/28/2003 3:32:26 PM
|
FIR-Aging Inspection | 7/9/2003 | 7/9/2003 | 7/9/2003 | | PASS |
Rick Jackson
|
|
|
talked to Trent and he said the work is in progress and they are 3 weeks out 7/10/2003 9:56:53 AM
|
Inspection Record Card- Fire | 4/9/2003 | | 4/9/2003 | | DONE |
|
|
|
|
Telephone call | | | 4/9/2003 | | |
|
|
|
CALLED 4-9-03
|
Issue and Print Permit | | | 4/9/2003 | | DONE |
|
|
|
|
Sprinkler Plan Check | 4/2/2003 | | 4/8/2003 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/8/2003 | | DONE |
Bill Alexander
|
|
|
|
Plan assigned to (Bill) | 11/27/2002 | | 4/8/2003 | | DONE |
|
|
|
4/8/2003 16:29:25 JWA - activity updated through activity FIRA22 from case FIR02-00477.
|
Plan resubmittals received | | | 4/1/2003 | | DONE |
|
|
|
|
Miscellaneous action | | | 2/13/2003 | | DONE |
|
|
|
Sent letter (mail) requesting information on status of resubmittals.
|
Telephone call | | | 1/27/2003 | | DONE |
|
|
|
Called Shawn Fenneron (designer) and requested revised covereage calculations which include requirements of roof and in-rack sprinkler combination flowing.
|
Sprinkler Plan Check | 1/21/2003 | | 1/27/2003 | | FAIL |
Bill Alexander
|
|
|
|
Application received | | | 1/21/2003 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 1/21/2003 | | 1/21/2003 | | DONE |
|
|
|
|
Plan resubmittals received | | | 1/21/2003 | | |
Bill Alexander
|
|
|
Required roof and inrack sprinkler calc verification. (Not mezzanine and inrack sprinkler calc verification). Waiting for revised calcs.
|
Telephone call | | | 12/13/2002 | | DONE |
|
|
|
plans denied... called to return
|
Sprinkler Plan Check | 11/27/2002 | | 12/12/2002 | | FAIL |
Bill Alexander
|
|
|
Fire sprinkler design does not meet installation requirements for use and commodity.
|
Miscellaneous action | | | 12/12/2002 | | DONE |
|
|
|
Took plans back to front desk for calling and returning for corrections
|
Application received | | | 11/27/2002 | | |
|
|
|
|