Permit Information
Permit NumberFIR02-00493
StatusFinaled
Name IDAHO FIRE PROTECTION
Site Address 2210 W MAIN ST
Project NameSPR WINDER OFFICE
Customer Number 
ePlanReview 
Description
(WINDER OFFICE) To install a new light hazard system in the entire structure for conversion of 4,024 ft/2, one story with basement, "A" Occupancy building to a office and storage building. Work includes the underground supply tapped off the existing 8" supply in Main Street. The fire sprinkler system work shall comply with NFPA 13-1999, attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit: BLD02-02891.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection3/27/20033/28/20033/28/2003APASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 3/27/2003 at 8:00:13 PM. Contact: ###-####.
DOC - Permit Finaled3/28/20033/28/20033/28/2003APASS
DetailsRick Jackson
Finaled by inspector at 3/28/2003 11:04:46 AM
INSP-Sprinkler Rough-in/Hydro3/27/20033/27/20033/27/2003PPASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 3/27/2003 at 9:48:47 AM. Contact: ###-####. UG and FDC hydro okay 3/27/2003 12:40:46 PM
INSP-Supply line flush3/25/20033/26/20033/26/2003APASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 3/25/2003 at 6:15:37 PM. Contact: ###-####.
INSP-Sprinkler Rough-in/Hydro2/24/20032/25/20032/25/2003APART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 2/24/2003 at 11:54:49 AM. Contact: ###-####. underground okay to cover; will need hydro on UG and FDC; flush required also; okay to cover overhead 2/25/2003 10:56:59 AM
INSP-Sprinkler Rough-in/Hydro2/25/20032/25/20032/25/2003PFAIL
DetailsRick Jackson
tried hydro - one head has small leak at main entrance - will rehydro 2/25/2003 3:41:26 PM
Issue permit  1/17/2003 DONE
Inspection Record Card- Fire1/16/2003 1/16/2003 DONE
Telephone call  1/16/2003 DONE
CALLED 1-16-03
Plan assigned to (Bill)12/12/2002 1/15/2003 DONE
1/15/2003 17:21:32 JWA - activity updated through activity FIRA22 from case FIR02-00493.
Sprinkler Plan Check  1/15/2003 PASS
Approved with CONDITIONS to be field verified.
PLANS/APPL TAKEN TO FRONT DESK  1/15/2003 DONE
Application received  12/30/2002 DONE
resubmittal
Plan assigned to (Bill)12/30/2002 12/30/2002 DONE
Telephone call  12/18/2002 DONE
plans failed called to return
Sprinkler Plan Check12/12/2002 12/17/2002 FAIL
DetailsBill Alexander
1. The pipe chase from the basement to the first floor is not identified as being protected. Provide fire sprinkler protection, unless this shaft is completely fire rated and inaccessible.
2. Basement under-stairs storage is not completely protected. Provide complete protection that will cover under the landing, etc.
3. Hallway #106 (one of several areas identified with "furniture by others") lacks full fire sprinkler protection (shadowing of walls obstructing coverage). Revise and resubmit.
3. Main floor has a "Lighted Box" that is 6'-0" wide by 14'-0" long, and 1'-4" deep which appears to not be shown or compensated with protection on the drawings. Include all obstructions that can affect fire sprinkler operation and coverage within this permit in the plans. This shall include ceiling grids, lights, diffusers, etc.
4. Main floor system design does not meet exceptions for minimum requirements for the "Room Design Method", 7-2.3.3. Correct, revise plans and calculations and resubmit.
5. Calculations do not match cover sheets (area/density coverage).
6. Calculations shall correspond with piping and fitting input for the sprinkler head area spacing verifying. If designer is verifying a spacing of 225-ft/2, then calculations must have the same lengths and fittings plugged in to correspond with that spacing, including the added friction losses incorporated, or spacing allowed will match plan spacing exactly, with no exceptions!
7. NFPA 13 does not cover the spacing of hangers for CPVC to sprinkler head drop elbows. Provide detail or information covering the listing requirements of the same on the plan for installer and field inspector verification.
8. "Cover sheets" submitted was modified and lack identification of construction information addressed in NFPA 13:1-4.6, A-1-4.6. Provide correct "Cover Sheets" which can be found on the "Web" at: http://www.cityofboise.org/pds/, Applications/Brochures, Fire Division Applications, "Fire Sprinkler Design Cover Sheet".
Miscellaneous action  12/17/2002 DONE
DetailsBill Alexander
Took failed plans to front desk for calling and returning.
Application received  12/12/2002