INSP-Final Inspection | 3/14/2003 | 3/14/2003 | 3/14/2003 | P | PASS |
Troy Cobbley
|
|
|
fire alarm system finaled
|
DOC - Permit Finaled | 3/14/2003 | 3/14/2003 | 3/14/2003 | P | PASS |
Troy Cobbley
|
|
|
Finaled by inspector at 3/14/2003 3:45:59 PM
|
INSP-Final Inspection | 3/12/2003 | 3/13/2003 | 3/13/2003 | A | FAIL |
Troy Cobbley
|
|
|
###-#### The 12 volt power supply #2 needs 26 ah batteries, need letter from Grinnell on verification of inspectors tests orfice size, provide verification on the knox key boxes are ok with the fire dept 3/13/2003 10:02:53 AM
|
INSP-Alarm Testing | 3/12/2003 | 3/12/2003 | 3/12/2003 | P | PART |
Troy Cobbley
|
|
|
finished testing the duct smoke detectors and the fire sprinkler riser in Ross. Need to finish the other sprinkler risers and panel items
|
INSP-Final Inspection | 3/7/2003 | 3/7/2003 | 3/7/2003 | P | PART |
Troy Cobbley
|
|
|
phil; Phone #: ###-#### Tested most of the duct smoke detectors. They have been marked on the approved alarm plans. No other devices tested. Phil to provide print out of the alarm points for verification at central station 3/7/2003 4:07:04 PM
|
Inspection Record Card- Fire | 1/17/2003 | | 1/17/2003 | | DONE |
|
|
|
|
Issue and Print Permit | | | 1/17/2003 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 12/24/2002 | | 1/10/2003 | | DONE |
|
|
|
1/10/2003 14:54:57 SLR - activity updated through activity FIRA22 from case FIR02-00512.
|
Alarm Plan Check | | | 1/10/2003 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/10/2003 | | DONE |
|
|
|
|
Telephone call | | | 1/10/2003 | | DONE |
|
|
|
CALLED 1-10-03
|
Application received | | | 12/24/2002 | | |
|
|
|
|