INSP-Final Inspection | 2/3/2003 | 2/4/2003 | 2/4/2003 | A | PASS |
Troy Cobbley
|
|
|
Scheduled by a contractor via Hello! on 02/03/2003 at 13:41:55. Contact: ###-####.
|
DOC - Permit Finaled | 2/4/2003 | 2/4/2003 | 2/4/2003 | A | PASS |
Troy Cobbley
|
|
|
Finaled by inspector at 2/4/2003 11:10:12 AM
|
INSP-Sprinkler Rough-in/Hydro | 1/27/2003 | 1/28/2003 | 1/28/2003 | P | FAIL |
Troy Cobbley
|
|
|
In two locations two drops have been taken off from a single outlet and in two other locations hangers need to be added. The locations are shown on the approved prints 1/28/2003 3:26:50 PM
|
Inspection Record Card- Fire | 1/3/2003 | | 1/3/2003 | | DONE |
|
|
|
|
Telephone call | | | 1/3/2003 | | DONE |
|
|
|
PERMIT READY AND FEES DUE
|
Issue and Print Permit | | | 1/3/2003 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 12/26/2002 | | 1/2/2003 | | DONE |
|
|
|
1/2/2003 17:46:57 SLR - activity updated through activity FIRA22 from case FIR02-00519.
|
Alarm Plan Check | | | 1/2/2003 | | PASS |
|
|
|
Approved with no written review, subject to satisfactory field inspection by PDS Fire.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/2/2003 | | DONE |
|
|
|
|
Application received | | | 12/26/2002 | | |
|
|
|
|