Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberFIR03-00016
StatusFinaled
Name MOUNTAIN ALARM
Site Address 102 N COLE RD
Project Namealm-SKATEWORLD
Customer Number 
ePlanReview 
Description
BUDGET OFFICE FURNITURE - To install a new fire alarm system to provide offsite fire sprinkler monitoring.
The associated building permit (BLD02-02924) is to remodel a 22,501 sq.ft. roller skating rink (SKATEWORLD BLDG) to convert to a retail/warehouse office furniture tenant. Work to include construction of interior partitions to create new office area, three new restrooms, tenant demising wall, installation of new truck ramp, installation of suspended ceiling system in office areas, new HVAC system, new accessible ramp, installation of new sprinkler system per NFPA #13 as regulated by the fire department.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection3/20/20033/21/20033/21/2003APASS
DetailsTroy Cobbley
robert; Phone #: ###-#### Fire alarm system finaled 3/21/2003 8:57:10 AM
DOC - Permit Finaled3/21/20033/21/20033/21/2003APASS
DetailsTroy Cobbley
Finaled by inspector at 3/21/2003 8:57:35 AM
INSP-Alarm Testing3/19/20033/20/20033/20/2003AFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 3/19/2003 at 11:30:48 AM. Contact: ###-####. duct detectors powered by panel; need calc's and it appears larger amp batteries will be needed; need to test sprinkler controls/flow 3/20/2003 10:37:28 AM
Miscellaneous action  3/19/2003 PASS
Received resubmittal as required in review comment #1 of 1/24/03, for a battery box required to house batteries which are larger than FAC panel can hold. Approved subject to satisfactory field inpection of installation.
Alarm Plan Check  3/18/2003 PASS
Plans modification approved with conditions to be field verified
PLANS/APPL TAKEN TO FRONT DESK  3/18/2003 DONE
Inspection Record Card- Fire3/18/2003 3/18/2003 DONE
Issue permit  3/18/2003  
Plan resubmittals received  3/10/2003 DONE
Telephone call  3/5/2003 DONE
telcon from Bob Coulter. He now reports that there are HVAC duct detectors which require monitoring. I indicated a resubmittal would be required to add to the FA system.
Issue permit  1/27/2003 DONE
Alarm Plan Check  1/24/2003 PASS
approved with CONDITIONS
PLANS/APPL TAKEN TO FRONT DESK  1/24/2003 DONE
Inspection Record Card- Fire1/24/2003 1/24/2003 DONE
Telephone call  1/24/2003 DONE
permit ready
Plan assigned to (SAM)1/10/2003 1/23/2003 DONE
1/23/2003 11:49:41 JWA - activity updated through activity FIRA22 from case FIR03-00009.
Plan resubmittals received  1/16/2003 DONE
Alarm Plan Check  1/14/2003 FAIL
copy of application faxed back to Mtn Alarm with missing items circled.
Application received  1/10/2003