Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberFIR03-00029
StatusFinaled
Name BOISE CITY AIRPORT
Site Address 3201 W AIRPORT WAY
Project Namealm-AIRPORT-NEW TERMINAL
Customer Number 
ePlanReview 
Description
BOISE CITY AIRPORT - This permit is to reflect modifications to plans issued under FIR02-00411. Modifications include, but are not limited to, the addition of a new FAC releasing panel and new NAC panel for a new pre-action sprinkler system being installed to protect a new baggage inspection mezzanine area.
The associated building permit is BLD 00-03428.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection11/4/201011/4/201011/4/2010APASS
DetailsForrest France
Permit finaled.
FIR-Aging Inspection11/3/201011/3/201011/3/2010 PASS
DetailsForrest France
FIR-Aging Inspection8/2/20108/2/20108/10/2010 PASS
DetailsForrest France
Okay for final
FIR-Aging Inspection5/21/20105/21/20105/21/2010 PASS
DetailsForrest France
Case Summary  4/13/2005  
Telephone call  8/13/2003 DONE
left mess that plans are ready to pickup & no fee
Issue and Print Permit  7/31/2003 DONE
(F) Reprint permit  7/31/2003 DONE
Telephone call  7/30/2003  
The applicant on the latest resubmittal for the Boise airport was Dante Frassa. I called and spoke with him regarding the quantity of plans I had as we are only storing two sets for resubmittals. I gave him a choice to deliver another set, or accept one set back. He stated that one set back would be sufficient. Therefore only one set was returned.
Alarm Plan Check  7/30/2003 PASS
Approved pending field inspection of fire alarm permit comments.
PLANS/APPL TAKEN TO FRONT DESK  7/30/2003 DONE
Inspection Record Card- Fire7/30/2003 7/30/2003 DONE
Telephone call  7/30/2003 DONE
permit ready and fees due
Plan resubmittals received  7/24/2003  
Plan resubmittals received  7/24/2003  
Alarm Plan Check  6/24/2003 FAIL
Plan Modification. Resubmittal required. Comments faxed to Peter Petroni 6/24/2003.
Plan resubmittals received  6/18/2003 DONE
INSP-Alarm Testing5/12/20035/14/20035/14/2003AFAIL
DetailsRick Jackson
tested all AHU's for shutdown and smoke/fire damper shutdown - dampers closed on AHU shutdown; tested all overhead doors except for baggage system doors - all okay; still need to test dry sprinkler system and baggage system doors; will need to reverify the alarm system at final 5/14/2003 12:45:12 PM
INSP-Alarm Testing5/9/20035/12/20035/12/2003PFAIL
DetailsRick Jackson
audible alarms in mechanical rooms; smoke/fire dampers aren't when AHU's are in fault; tested notification in all areas - okay; 5/12/2003 4:35:54 PM
INSP-Final Inspection5/8/20035/9/20035/9/2003AFAIL
DetailsRick Jackson
###-#### robert Node 4 has ground fault; labels on several detectors not correct - see mapnet listing; strobes overspaced in mezzanine; nned to test dry sprinkler system and all troubles for TAC panels; need to test alarm condition for proper noise levels through speakers; need to drop test all overhead doors; ned to test troubles on main FACP; need programmed button labels on main FACP 5/9/2003 5:00:02 PM
Override - Parcel Holds  5/8/2003  
PLANS/APPL TAKEN TO FRONT DESK  5/1/2003 DONE
Override - Parcel Holds  5/1/2003  
Inspection Record Card- Fire5/1/2003 5/1/2003 DONE
Telephone call  5/1/2003 DONE
left mess that permit is ready
Override - Parcel Holds  5/1/2003  
Issue permit  5/1/2003 DONE
Alarm Plan Check  4/30/2003 PASS
Per telcon with Peter Petroni, Simplex, questions resolved to complete the review.
Plan resubmittals received  4/25/2003 HOLD
Resubmittal received 4/7. Cannot complete evaluation without further explanation of plan submittal. Hold review or call-back from Simplex.
Issue permit  3/19/2003  
Alarm Plan Check  3/13/2003 PASS
Resubmittal plans acceptable
PLANS/APPL TAKEN TO FRONT DESK  3/13/2003 DONE
Inspection Record Card- Fire3/13/2003 3/13/2003 DONE
Telephone call  3/13/2003 DONE
CALLED LEFT MESSAGE 3-13-03
Plan resubmittals received  2/19/2003 DONE
Meeting  2/13/2003 DONE
Meeting with Rod Ludlow, CSHQA and Stepahnie Cribbs, Simplex to review plans. Identified items needing revision on plans. List of revisions faxed to Simplex. Stephanie to revise plans accordingly and resubmit 3 complete sets of revised drawings.
Alarm Plan Check  2/7/2003 FAIL
Plan modifications not adequately described; matrix inadequate to verify proper operation of PA systems. Called Simplex, Stepahnie to discuss with Peter Petroni and CSHQA and decide who could come in to discuss the plans. Hold further plan review until resolved; no written comments sent out.
Plan assigned to (SAM)1/21/2003 1/29/2003 DONE
1/29/2003 09:38:09 JWA - activity updated through activity FIRA22 from case FIR02-00005.
Application received  1/21/2003