INSP-Final Inspection | 1/21/2004 | 1/21/2004 | 1/21/2004 | A | PASS |
Troy Cobbley
|
|
|
|
DOC - Permit Finaled | 1/21/2004 | 1/21/2004 | 1/21/2004 | A | PASS |
Troy Cobbley
|
|
|
Finaled by inspector at 1/21/2004 11:19:00 AM
|
INSP-Sprinkler Rough-in/Hydro | 7/30/2003 | 7/30/2003 | 7/30/2003 | P | PASS |
Troy Cobbley
|
|
|
Underground hydro test is ok 7/30/2003 3:21:23 PM
|
Override - Parcel Holds | | | 7/30/2003 | | |
|
|
|
|
INSP-Supply line flush | 3/17/2003 | 3/19/2003 | 3/19/2003 | A | PART |
Troy Cobbley
|
|
|
The 6" underground supply was flushed. Out of a 4" outlet we got 3 1/4 psi which translates to 780 gallons. This flow needs to be verified to see if it will meet any of the exceptions to the 880 gallons required in NFPA 13 3/19/2003 11:22:24 AM
|
INSP-Supply line flush | 3/19/2003 | 3/19/2003 | 3/19/2003 | P | PASS |
Troy Cobbley
|
|
|
The valve at the street was half way closed. Flushed UG with open valve and everything looks good
|
INSP-Conference | 2/5/2003 | 2/6/2003 | 2/6/2003 | A | PASS |
Troy Cobbley
|
|
|
inspection was for the underground fire sprinkler supply. Piping is OK for cover 2/6/2003 11:22:54 AM
|
Inspection Record Card- Fire | 1/28/2003 | | 1/28/2003 | | DONE |
|
|
|
|
Telephone call | | | 1/28/2003 | | DONE |
|
|
|
CALLED 1-28-03
|
Issue and Print Permit | | | 1/28/2003 | | DONE |
|
|
|
|
Application received | | | 1/28/2003 | | |
|
|
|
|
Plan assigned to (Bill) | 1/28/2003 | | 1/28/2003 | | DONE |
|
|
|
1/28/2003 09:42:05 JWA - activity updated through activity FIRA22 from case FIR03-00035.
|
Sprinkler Plan Check | 1/28/2003 | | 1/28/2003 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/28/2003 | | DONE |
Bill Alexander
|
|
|
|
Case Summary | | | | | DONE |
|
|
|
|