INSP-Final Inspection | 12/31/2003 | 12/31/2003 | 12/31/2003 | A | PASS |
Rick Jackson
|
|
|
|
DOC - Permit Finaled | 12/31/2003 | 12/31/2003 | 12/31/2003 | P | PASS |
Rick Jackson
|
|
|
Finaled by inspector at 12/31/2003 1:54:36 PM
|
Override - Parcel Holds | | | 12/30/2003 | | |
|
|
|
|
Issue and Print Permit | | | 12/30/2003 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 12/30/2003 | | |
|
|
|
|
Inspection Record Card- Fire | 12/30/2003 | | 12/30/2003 | | DONE |
|
|
|
|
Sprinkler Plan Check | 11/4/2003 | | 12/29/2003 | | PASS |
Bill Alexander
|
|
|
Added PRV for fire pump.
Problem with resubmittals. Called Don Weland and asked for more information, i.e., data submittals on PRV, verification of hydraulics that 175 psi maximum pump pressure will be sufficiant for most remote/demanding area calculations.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/29/2003 | | DONE |
|
|
|
|
Telephone call | | | 12/29/2003 | | DONE |
|
|
|
left mess that permit is ready
|
Override - Parcel Holds | | | 12/29/2003 | | |
|
|
|
|
Permit Ready to Issue | | | 12/29/2003 | | DONE |
|
|
|
|
Telephone call | | | 12/17/2003 | | DONE |
|
|
|
Recieved fax data on pressures of maximum required and PRV setting. No other required detailed information provided.
|
Telephone call | | | 11/10/2003 | | DONE |
Bill Alexander
|
|
|
Problem with resubmittals. Called Don Weland and asked for more information, i.e., data submittals on PRV, verification of hydraulics that 175 psi maximum pump pressure will be sufficiant for most remote/demanding area calculations.
|
Plan resubmittals received | | | 11/4/2003 | | |
|
|
|
|
INSP-Final Inspection | 10/1/2003 | 10/2/2003 | 10/2/2003 | A | PART |
Rick Jackson
|
|
|
as per requestd, to test peration of pressure relief valve.; Phone #: ###-#### Internet Inspection Request from: Trent Bice 10/2/2003 9:12:44 AM pressure-reducing valve is installed; need submittals to plan review and approval prior to final sign-off 10/2/2003 2:54:29 PM
|
INSP-Sprinkler Rough-in/Hydro | 9/29/2003 | 9/30/2003 | 9/30/2003 | P | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 9/29/2003 at 2:08:05 PM. Contact: ###-####. QR heads installed in all areas; still have tape on heads in stairs; system over 175 psi and a pressure reducing valve is supposed to be coming; bell still not attached to wall; fire pump room requires firestopping at floor joint; will need all certification paperwork at final 9/30/2003 4:15:42 PM
|
INSP-Alarm Testing | 9/29/2003 | 9/29/2003 | 9/29/2003 | A | FAIL |
Rick Jackson
|
|
|
tested all exsisting and new tampers and flows - okay; still need to verify phase reversal; system pressure over 175 psi
|
INSP-Alarm Testing | 9/23/2003 | 9/25/2003 | 9/25/2003 | P | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 9/23/2003 at 1:58:24 PM. Contact: ###-####. tested fire pump with pump rep and Shilo - tested per NFPA 20 9/25/2003 4:10:25 PM
|
INSP-Sprinkler Rough-in/Hydro | 9/23/2003 | 9/24/2003 | 9/24/2003 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 9/23/2003 at 1:54:20 PM. Contact: ###-####. hydro okay on new standpipe 9/24/2003 12:22:41 PM
|
INSP-Sprinkler Rough-in/Hydro | 9/22/2003 | 9/23/2003 | 9/23/2003 | A | CANC |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 9/22/2003 at 2:23:57 PM. Contact: ###-####. hydro on standpipe not ready 9/23/2003 1:10:47 PM
|
INSP-Sprinkler Rough-in/Hydro | 9/11/2003 | 9/12/2003 | 9/12/2003 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 9/11/2003 at 1:08:43 PM. Contact: ###-####. hydro okay on overhead 9/12/2003 10:50:57 AM
|
INSP-Sprinkler Rough-in/Hydro | 6/27/2003 | 7/2/2003 | 7/2/2003 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 6/27/2003 at 10:47:03 AM. Contact: ###-####. first floor east end tenant okay to cover; will have 200 degree heads in laundry room by 7/3 7/2/2003 10:17:35 AM
|
INSP-Sprinkler Rough-in/Hydro | 6/27/2003 | 6/30/2003 | 6/30/2003 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 6/27/2003 at 10:45:49 AM. Contact: ###-####. 4th floor (west side) r/i okay; heads not complete 6/30/2003 9:49:30 AM
|
Sprinkler Plan Check | 6/25/2003 | | 6/26/2003 | | PASS |
Bill Alexander
|
|
|
Plan modifications (Architectural changes).
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/26/2003 | | DONE |
Bill Alexander
|
|
|
|
Inspection Record Card- Fire | 6/26/2003 | | 6/26/2003 | | DONE |
|
|
|
|
Telephone call | | | 6/26/2003 | | |
|
|
|
LEFT MESS THAT PERMIT IS READY
|
Issue permit | | | 6/26/2003 | | DONE |
|
|
|
|
Plan resubmittals received | | | 6/24/2003 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 6/24/2003 | | 6/24/2003 | | DONE |
|
|
|
|
INSP-Sprinkler Rough-in/Hydro | 6/9/2003 | 6/11/2003 | 6/11/2003 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 6/9/2003 at 8:25:40 AM. Contact: ###-####. EQ's not attached to beams and attached to interior walls 6/11/2003 12:30:09 PM
|
INSP-Sprinkler Rough-in/Hydro | 6/11/2003 | 6/11/2003 | 6/11/2003 | P | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 6/11/2003 at 11:29:08 AM. Contact: ###-####. 4th floor area B okay; main riser and standpipe in east stairwell is located in path of door and will have to relocated 6/11/2003 4:01:37 PM
|
INSP-Sprinkler Rough-in/Hydro | 5/27/2003 | 5/30/2003 | 5/30/2003 | A | PASS |
Troy Cobbley
|
|
|
I gave approval to cover area "A" on the 1st, 2nd and the 3rd floors. The south side 3rd floor 1" and 1 1/4" piping is not tied into the area "B" piping yet. Grooved cplgs at the expansion joints. Walls are not up yet on the third floor but hangers and eq bracing looked ok 5/30/2003 12:44:50 PM
|
INSP-Sprinkler Rough-in | 5/5/2003 | 5/6/2003 | 5/6/2003 | A | PART |
Rick Jackson
|
|
|
###-#### okay on first floor area A; will need tor echeck area at north stair as this wasn't finished 5/6/2003 4:14:37 PM
|
INSP-Sprinkler Rough-in/Hydro | 5/2/2003 | 5/5/2003 | 5/5/2003 | P | CANC |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 5/2/2003 at 1:28:18 PM. Contact: ###-####. escheduled for 5/6; left message with Mike's voicemail that I would be out on 5/6 5/5/2003 4:56:58 PM
|
INSP-Sprinkler Rough-in/Hydro | 4/24/2003 | 4/25/2003 | 4/25/2003 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 4/24/2003 at 8:39:42 AM. Contact: ###-####. okay to cover 2nd and 3rd floor in area B only 4/25/2003 9:23:46 AM
|
INSP-Sprinkler Rough-in/Hydro | 4/21/2003 | 4/22/2003 | 4/22/2003 | P | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 4/21/2003 at 11:31:44 AM. Contact: ###-####. need hangers on third floor; encroaching into fire proofing on second; Mike is going to check with GC about it 4/22/2003 4:19:26 PM
|
INSP-Sprinkler Rough-in | 4/8/2003 | 4/11/2003 | 4/11/2003 | A | FAIL |
Rick Jackson
|
|
|
MIKE ###-#### need additional EQ in three areas; see plans for exact locations 4/11/2003 9:51:36 AM
|
INSP-Sprinkler Rough-in | 4/11/2003 | 4/11/2003 | 4/11/2003 | P | PART |
Rick Jackson
|
|
|
area B on first floor okay to cover 4/11/2003 3:43:37 PM
|
Override - Parcel Holds | | | 4/8/2003 | | |
|
|
|
|
Override - Parcel Holds | | | 3/5/2003 | | |
|
|
|
|
Issue and Print Permit | | | 3/5/2003 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 3/4/2003 | | |
|
|
|
|
Inspection Record Card- Fire | 3/4/2003 | | 3/4/2003 | | DONE |
|
|
|
|
Telephone call | | | 3/4/2003 | | DONE |
|
|
|
permit ready
|
Plan assigned to (Bill) | 2/18/2003 | | 3/3/2003 | | DONE |
|
|
|
3/3/2003 15:37:09 JWA - activity updated through activity FIRA22 from case FIR03-00068.
|
Sprinkler Plan Check | 2/18/2003 | | 3/3/2003 | | PART |
Bill Alexander
|
|
|
Requires resubmittal (reference review notes attached).
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/3/2003 | | DONE |
Bill Alexander
|
|
|
|
Application received | | | 2/18/2003 | | |
|
|
|
|
Plan assigned to (Bill) | 11/4/2003 | | | | |
Bill Alexander
|
|
|
|