INSP-Final Inspection | 8/27/2003 | 8/27/2003 | 8/27/2003 | P | PASS |
Rick Jackson
|
|
|
|
DOC - Permit Finaled | 8/27/2003 | 8/27/2003 | 8/27/2003 | P | PASS |
Rick Jackson
|
|
|
Finaled by inspector at 8/27/2003 3:28:53 PM
|
INSP-Supply line flush | 5/30/2003 | 5/30/2003 | 5/30/2003 | P | PASS |
Troy Cobbley
|
|
|
Supply line flushed 5/30/2003 3:46:07 PM
|
INSP-Supply line flush | 5/18/2003 | 5/19/2003 | 5/19/2003 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 5/18/2003 at 12:41:44 PM. Contact: ###-####. hydro on UG and FDC okay; man hole is installed for the FDC - will need to verify drain and ball drip installed 5/19/2003 10:01:57 AM
|
INSP-Supply line flush | 4/10/2003 | 4/11/2003 | 4/11/2003 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 4/10/2003 at 8:55:42 AM. Contact: ###-####. r/i of UG okay; still need to flush 4/11/2003 9:47:10 AM
|
INSP-Supply line flush | 3/5/2003 | 3/5/2003 | 3/5/2003 | P | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 3/5/2003 at 7:55:50 AM. Contact: ###-####. 6 inch stub out; will need to sleeve at floor level 3/5/2003 1:38:31 PM
|
Issue and Print Permit | | | 2/21/2003 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 2/20/2003 | | 2/20/2003 | | DONE |
|
|
|
|
Telephone call | | | 2/20/2003 | | DONE |
|
|
|
permit ready and fees due
|
Application received | | | 2/20/2003 | | |
|
|
|
|
Plan assigned to (Bill) | 2/19/2003 | | 2/20/2003 | | DONE |
|
|
|
2/20/2003 11:38:47 JWA - activity updated through activity FIRA22 from case FIR03-00071.
|
Sprinkler Plan Check | 2/19/2003 | | 2/20/2003 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/20/2003 | | DONE |
Bill Alexander
|
|
|
|
Case Summary | | | | | DONE |
|
|
|
|